- 规格:
- 500*500*40cm
- 规格:
- 470*400*60
- 规格:
- 420*400*60cm
The production cost of the ditch cover mold is high. Because the ditch mold uses B engineering plastics as raw materials, and the price of B material on the market is very high, the weight of a ditch cover mold can reach about grams, so a mold The materials alone cost a lot, so the production cost is very high. In this regard, costs can be reduced in several places. Since the ditch cover mold itself is heavy, the wall thickness of the reinforcement and the bottom plane can be reduced to appropriately adjust the weight, so that the production cost can be effectively controlled.
The gutter cover mold has a long processing cycle from design, material selection, external processing, assembly, and final molding production. This step takes a lot of time. In terms of design, after receiving the drawings, 3 shapes are carried out, then the cover mold is separated, and finally the drawings are produced to facilitate subsequent external processing. It takes 3 days in total. It usually takes a day for the ordered materials to arrive at the factory. As for external processing, that is the most important point of the ditch cover mold technology. The surface of the processing mold is smooth, the size is accurate, and it meets the customer's requirements. Only such external processing can be considered successful. It will take days after each processing is completed. Generally speaking, the cycle time of a high-quality gutter cover mold is generally about one month.
Summary: The technical requirements for ditch cover molds are the above two points that are most important. Controlling the production cost is high, the processing cycle is long, the precision is high, and the service life is long. Then the ditch cover mold technology will be improved to meet customer requirements.