Hubei Xiangfan/Loach Loach Mixed Culture Special Anti-seepage Membrane Production and Wholesale Base
Shandong Tai’an Yongli Manufacturer specializes in the production of anti-seepage membrane base, *3* ten years of manufacturing, and is far ahead in the field of anti-seepage membrane products! Special anti-seepage membrane production and wholesale production for lotus root and loach mixed culture in Xiangfan, Hubei
The wholesale base is professional because of its focus! Yongli anti-seepage membrane manufacturer mainly produces and operates: special anti-seepage membrane for mixed culture of lotus root and loach in Xiangfan, Hubei, special anti-seepage membrane for lotus root pond culture in Xiangfan, Hubei, special anti-seepage membrane for mixed culture of lotus root and loach in Xiangfan, Hubei Special anti-seepage membrane, special anti-seepage membrane for lotus root pond breeding in Xiangfan, Hubei Province, special anti-seepage membrane for lotus root and loach mixed culture in Xiangfan, Hubei Province, special anti-seepage membrane for lotus root pond breeding in Xiangfan, Hubei Province, special anti-seepage membrane for breeding of mud loach in Xiangfan, Hubei Province, Special anti-seepage membrane for fish pond and fish pond breeding in Xiangfan, Hubei, special anti-seepage membrane for lotus root pond breeding in Xiangfan, Hubei, special anti-seepage membrane for loach breeding in Xiangfan, Hubei
, anti-seepage membrane for household waste disposal in Xiangfan, Hubei, polyculture of lotus root and loach in Xiangfan, Hubei Special anti-seepage membrane, special anti-seepage membrane for lotus root pond breeding in Xiangfan, Hubei, special anti-seepage membrane for loach breeding in Xiangfan, Hubei, Hubei Xiangfan
Anti-seepage membrane for sewage reservoir, special anti-seepage membrane for mixed cultivation of lotus root and loach in Xiangfan, Hubei Xiangfan eel breeding anti-seepage membrane, Hubei Xiangfan biogas pool treatment anti-seepage membrane and other geotechnical material
manufacturers!
Construction method of anti-seepage membrane
Method: *3*
Do not drag or pull the anti-seepage membrane during transportation to avoid being stabbed by sharp objects.
, should be extended from the bottom to the high position, do not pull too tight, should leave a margin of
to prepare for local sinking and stretching. Considering the actual situation of this project, the slopes should be laid in order from top to bottom
. The longitudinal joints of two adjacent panels should not be on a horizontal line, but should be staggered from each other
, The longitudinal joint should be away from the dam foot and the bent foot. Above, it should be located on the plane
, first the side slope and then the field bottom
When laying the side slope, the direction of the membrane expansion should be basically parallel to the end
/>High slope line.
Laying of anti-seepage membrane: *3*
. Before laying the anti-seepage membrane, the corresponding acceptance certificate of the civil engineering project should be obtained.
. Before cutting the anti-seepage membrane, its relevant dimensions should be accurately measured
and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the picture. The pieces should be numbered one by one and recorded in detail on a special form. .
. When laying the geomembrane, the welds should be minimized and raw materials should be saved as much as possible while ensuring
quality. It is also easy to ensure quality.
. The overlap width of the seams between membranes is generally not less than 1, and usually the welding seam arrangement direction is parallel to the maximum slope, that is, arranged along the slope direction.
. Usually in corners and deformed areas, the length of the joints should be shortened as much as possible. Except for special requirements, on slopes with a slope greater than:
. meters away from the top slope or stress concentration area, try not to install welds.
. When laying the anti-seepage membrane, artificial wrinkles should be avoided. When the temperature is low, it should be tightened and laid as flat as possible.
. After the anti-seepage membrane is laid, walking on the membrane surface, moving tools, etc. should be minimized
Any objects that can cause harm to the anti-seepage membrane should not be placed on the membrane or Carry it while walking on the membrane to avoid accidental damage to the membrane.
The above is a detailed introduction to the special anti-seepage membrane production and wholesale base *3* for lotus root and loach mixed culture in Xiangfan, Hubei Province. For more product introductions, you can add the manufacturer or the manufacturer's WeChat official account:
3 On behalf of all the staff of Yongli Factory, Manager Xu welcomes you to visit the factory and purchase at any time!