Hello and welcome toTitker Trade Network!
Sales and production of building materials

free member

The latest sales price of Anshan equipment foundation grouting material manufacturer

价格 1200.00元/吨
total supply
99999 吨
MOQ
1 吨
brand
恒众鑫
area
Liaoning
Delivery period:
Shipped within 1 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Liaoning

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Dalian Hengzhongxin New Building Materials Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details

The latest sales price of Anshan equipment foundation grouting material manufacturer contact manager Ma's phone number
In terms of project performance: Beijing-Shanghai High-speed Railway, Beijing Subway Line 1, Shanghai Rail Transit Line, Dalian Heavy Machinery Factory, Hafei Manufacturing Factory, Beijing No. 1 Machine Tool Factory, Jinan No. 1 Machine Tool Factory, Jinan No. 2 Machine Tool Factory, Hebei Handan Steel Plant, Tangshan Shougang Group, Changzhou Ring Expressway, and electric power: Shizuishan Dawukou Power Plant, Fulalji Second Power Plant, Zhangjiakou Shaling Power Plant, Beijing Shijingshan Thermal Power Plant, Three Gorges Hydropower Station, Waigaoqiao Power Plant, Datong Second Power Plant, Harbin Third Power Plant Industrial and Residential Construction Engineering Performance: Pangu Seven Stars, Beijing Vanke Park, Beijing Ye Group, Qinghe Jia Park, Jintongda, Tangshan Brewery, Forbidden City, Community, Tianjin Development Zone Xintiandi Huating, Guangzhou International Building, Tianjin People's Printing Factory, Yunhu Resort, China Jingye Building, Tsinghua University Teaching Building, Huatang Shopping Mall, Weber Hao Apartment, Atlantic New City, Minyue Home, Xizhimen Gas Command Center, Tsinghua University Student Building, Ocean View,
, early strength, high strength
Day compressive strength 3 days compressive strength 3 days compressive strength .
, micro-expansion
Ensure close contact between equipment and foundation, and no shrinkage after secondary grouting.
High self-flowing property
It can fill all the gaps and meet the requirements of secondary grouting of the equipment.
, strong durability
After millions of fatigue tests and freeze-thaw cycles, there is no significant change in strength. The strength is significantly improved after soaking in engine oil for 3 days.
, can be constructed in winter
Outdoor construction is allowed at -℃ temperature.
Product usage
Used for secondary grouting of equipment foundation. , used for anchoring anchor bolts and planting steel bars.
Used for reinforcement and repair of concrete structures. , used for beam and column cross-section enlargement and reinforcement projects.
Implementation standards
Preparation before construction
Machine mixing: concrete mixer or mortar mixer. , Manual mixing: several mixing tanks and shovels.
Several buckets. , several scales.
, mixing tank. , high funnel, grouting pipe and pipe joints.
, grouting booster. , Templates (steel molds, wooden molds).
, straw bags, rock wool quilts, etc. , cotton yarn, tape.
Grouting construction
The first step: foundation treatment
The surface of the foundation should be roughened, or a special reinforcing interface agent concrete re-pouring agent should be used for interface treatment.
Clean the foundation surface, and there should be no debris, floating slurry, floating ash, oil stains, release agents and other debris.
Before grouting, the foundation surface should be fully moistened, and accumulated water should be removed before grouting.
Step 2: Set up the formwork
Set up the formwork according to the grouting construction drawing. The joints between the formwork and the foundation, and between the formwork and the formwork should be sealed with cement slurry (quick leak-stopping agent is recommended), tape, etc. to ensure that the entire formwork does not leak.
The horizontal distance between the formwork and the equipment base should be controlled to the left and right to facilitate grouting construction.
The top elevation of the formwork should be higher than the upper surface of the equipment base.
If grouting occurs during grouting, it should be dealt with in time.
Step 3: Preparation of grouting material
Generally, add water and stir according to the standard of 3- for the general reinforced type, and add water and stir according to the standard for the pisolite reinforced type.
It is recommended to use mechanical mixing method, the mixing time is generally - (hand electric drill type mixer is strictly prohibited). When using manual mixing, you should first add /3 of the water to mix, then add the remaining water and mix until uniform.
The amount of mixing each time should be determined according to the usage amount to ensure that the material is used up within the time limit.
When used on site, it is strictly prohibited to mix any additives or external additives into the grouting material.
Step 4: Grouting construction method
For long equipment or track foundation, segmented construction should be used.
Illustrations of several commonly used grouting methods:
During secondary grouting, the following requirements should be met.
When grouting for the second time, grouting should be carried out from multiple points on one side or adjacent two sides until it overflows from the other side to facilitate exhaust during the grouting process. Grouting shall not be carried out from all four sides at the same time.
After grouting begins, it must be carried out continuously without interruption. And shorten the grouting time as much as possible.
Vibration is strictly prohibited during the grouting process. If necessary, the grouting booster can be used to push the grouting material along the bottom of the grouting layer. It is strictly prohibited to push from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.
After the equipment foundation grouting is completed, the bevel should be cut outward along the edge of the equipment 3-3 months after grouting to prevent cracks at the free end. If the edge cannot be trimmed, it should be trimmed with a spatula 3-3 months after grouting. The surface of the grouting layer is calendered.
When the thickness of the grouting layer exceeds 100%, pisolite-reinforced high-strength non-shrinkage grouting material should be used.
When the equipment foundation grouting volume is large, mechanical stirring should be used to stir the pisolite reinforced grouting material to ensure grouting construction.
Step 5: Maintenance
After grouting is completed, it should be immediately covered with wet straw curtains or rock wool quilts and kept moist within 3 days.
During winter construction, maintenance measures should also comply with the relevant provisions of the current reinforced concrete engineering construction and acceptance specifications (B).
After the grouting material reaches the film removal time, the equipment can be installed. For the specific time, please refer to the relationship table between film removal and curing time and ambient temperature.
After the equipment foundation grouting is completed, if there is any part that needs to be removed, it can be gently removed with a spatula or shovel tool 3-3 days after the grouting is completed, that is, before the grouting layer hardens.
. The vibration of the running machine must not be transmitted to the equipment foundation. After the secondary grouting, the machine should be stopped to avoid damaging the unhardened grouting layer.
Packaging, storage and transportation
Packaging specifications: ./bag, stored in a ventilated and dry place and protected from direct sunlight.
The shelf life is one month. If it exceeds the shelf life, it must be re-inspected before it can be used.
It does not contain benzene series, halogenated hydrocarbons, formaldehyde, heavy metals and other ingredients. It is non-toxic, odorless, non-polluting, non-flammable and non-explosive, and can be transported as general cargo.
"The latest sales price of Anshan equipment foundation grouting material manufacturer"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Free technical grid shock-absorbing star Supply of special anti-seepage membrane One-way sliding anti-seismic spherical h Tile adhesive tile adhesive tile special DG grouting material manufacturer direct Swinger DG grouting material Xianyang ma Xi'an well-known enterprise DG brand gro Gabion bag manufacturer_Gabion bag price Gabion bag_Gabion bag price_High quality Mine regreening construction materials, Mining site construction materials, prof WJJGZ Grid Shock Absorbing Star Steel Be Extruded board price Movable spherical steel bearing finished WJKGZ single activity seeking shaped ste
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【The latest sales price of Anshan equipment foundation grouting material manufacturer】are provided by member【Dalian Hengzhongxin New Building Materials Co., Ltd. 】,By Titker Trade Network members 【Dalian Hengzhongxin New Building Materials Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network