Panjin epoxy resin repair cement manufacturer
Epoxy anti-corrosion cement construction method
1. Surface treatment
Remove welding slag, rust, water marks, oil stains, Dust and other loose attachments must be kept at a certain degree of dryness. When the anti-corrosion level is high, the rust removal standard on the painted surface should reach level 1. When painting on concrete surfaces, the surface to be coated must be completely dry and flat.
2. Construction environmental conditions
Temperature: generally controlled at ~3℃
Humidity: generally controlled at no greater than (atmospheric humidity)
In the presence of frost, rain, fog and Under severe wind and sand conditions, outdoor construction is prohibited.
3. Preparation of paint
The ratio of resin clay is A: B: Proportion. You can add an appropriate amount of filler material
Stir it thoroughly and allow it to mature for a few minutes before construction. Control it within Use it within an hour
The fiberglass cloth should be posted flatly without being tilted or hollowed out, and the mesh should be filled tightly with resin glue
When applying the second coat of paint, the minimum painting interval is hours, and the longest 3 weeks.
, The final process must be maintained for one week after passing the acceptance inspection before it can be delivered for use.
4. Coating brush
One cloth and two oils, two cloths and three oils, three cloths and five oils, or choose and apply according to the design requirements.
5. Precautions
Strictly control the process and technical requirements. After each process of on-site operation is completed, it must pass the self-inspection and then pass the on-site supervision inspection before proceeding to the next process. The operator must be equipped with necessary equipment. Protective equipment
Safe and save electricity. The ground cable must be intact. After rust removal is completed, cut off the power immediately before painting
According to the actual situation on site, ventilation should be maintained during on-site operations in a small space and backup ventilation must be provided. Facilities
If the construction site encounters temporary sand and rain, it must be covered with colored cloth to avoid affecting the coating quality
. After the painting process is completed, if the coating is not dense enough, hollow or other reasons, it should be repaired immediately. .