Construction of high-density polyethylene anti-seepage membrane
Construction method
Do not drag or pull the anti-seepage membrane during transportation to avoid being stabbed by sharp objects.
, should extend from the bottom to the high position, do not pull
too tightly, and should leave a margin of . to prepare for local sinking and stretching. Taking into account the actual situation of this project, the slope should be laid from top to bottom. The longitudinal joints of two adjacent panels should not be on a horizontal line, but should be staggered above each other. The joints should be located
away from the dam feet and bent feet. Above, they should be located on the plane
, first on the slope and then on the field bottom
. When laying on the slope, the direction of the membrane expansion should be basic
/> Parallel to the line of maximum slope.
Laying of anti-seepage membrane:
. Before laying the anti-seepage membrane, the corresponding acceptance certificate of the civil engineering project should be obtained.
Before cutting the anti-seepage membrane, its relevant dimensions should be accurately measured, and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the figure. It should be numbered piece by piece
and recorded in detail in a dedicated on the form.
3. When laying the anti-seepage membrane, we should strive to minimize the number of welds and save as much raw materials as possible while ensuring quality. It is also easy to ensure quality.
. The overlap width of the seams between membranes is generally not less than 1, and usually the welds are arranged in a direction parallel to the maximum slope, that is, arranged along the slope direction.
. Usually in corners and deformed areas, the length of the joints should be shortened as much as possible. Except
except for special requirements, welding seams should be avoided as much as possible on slopes with a slope greater than: .
. Anti
When laying the anti-permeability membrane, artificial wrinkles should be avoided. When the temperature is low, it should be tightened and laid as flat as possible.
. After the anti-seepage membrane is laid, you should
minimize walking on the membrane surface, moving tools, etc. Any objects that can cause harm to the anti-seepage membrane should not be placed on the anti-seepage membrane. Or carry
walking on the anti-seepage membrane to avoid accidental damage to the anti-seepage membrane.
Yongli manufacturers have long-term cooperation with environmental protection projects in various regions across the country. They will choose us for landfills, landfills, sewage treatment and other projects. So what are you still hesitating about now? ! The following is the manufacturer's contact information