- 型号:
- 0.8cm-6.0cm
- 规格:
- 2*15m(宽*长)
- 原料:
- 聚乙烯
{++} Kaifeng drainage board--high pressure drainage board manufacturer--D drainage board model--green drainage board price--drainage board pictures
The D material used for the drainage board is a new drainage material that integrates drainage and water storage functions. It has the advantages of light weight, high load resistance, drainage, water storage, heat insulation, convenient transportation, and easy construction. The manufacturer is located in Tai'an City, Shandong Province, specializing in the production of drainage boards with complete models and wholesale prices starting from the lowest square meter. The manufacturer has professional construction team members who can provide you with construction services.
{++}{-}After ordering, the products will be shipped directly to the customer through logistics. For the sake of the customer, the product will be sold at the lowest price under the premise of ensuring quality. Welcome to visit the factory at any time! Let’s create a better tomorrow together!
Drainage board laying procedures: {++ Manager Li}
When laying drainage boards in any area, you must pay attention: do not let dirt, cement, yellow sand and other garbage enter the front space of the drainage board to ensure the space of the drainage board. smooth.
. Clean up the garbage at the paving site and level the cement so that there are no obvious concavities and convexities on the site. Outdoor garage roofs and roof gardens need to have slopes.
.In this way, the water discharged from the drainage board can be discharged to the nearby sewer pipe or nearby city sewer.
. On the elevated floor above the foundation, that is, before making the floor, a layer of drainage board is made, with a round protruding platform and blind ditches left on all sides to prevent groundwater from coming up. Water will naturally flow into the surrounding blind ditches through the space of the drainage board. Then it flows into the sump through the blind ditch.
. When the drainage board is laid, protective measures should be taken as much as possible. When laying the drainage board in the outdoor garage, backfilling should be done as soon as possible to prevent strong winds from blowing the drainage board and affecting the laying quality. For basement and interior wall waterproofing, a protective layer should be installed as soon as possible to prevent the drainage board from being damaged by people or objects.
. The backfill soil is cohesive soil and needs to be spread on top of the geotextile. A centimeter of yellow sand is ideal, which is beneficial to the water filtration of the geotextile. If the backfill soil is a kind of nutritious soil or light soil, there is no need to lay another layer of yellow sand. The soil itself is very loose and easy to filter water.
. When laying the drainage board, overlap it side by side - the fulcrum can also be that the two bottom plates touch the top and use geotextile to overlap. As long as no soil enters the drainage channel of the drainage board, drainage can be kept smooth.