Product Details
Type internal combustion rail drilling machine_picture_production_price
--Jinzhou Shuangxing# Twenty years of professional manufacturing
Contact person: Manager Zhang
Address: Song, Linghe District, Jinzhou City, Liaoning Province Slope Road
Office-
Consultation Hotline
Online
Telephone- -
--Strive to create a leading brand in the industry# Jinzhou Shuangxing
Type Internal Combustion Rail Drilling Machine_Picture_Production_Price
Jinzhou Shuangxing Railway Machinery Co., Ltd. is located in the beautiful coastal city of Jinzhou, Liaoning. It is a company specializing in the production of rail drilling machines, rail sawing machines, tamping picks, rail grinders, and hydraulic square sleepers. Manufacturer of road maintenance machinery and line fasteners such as track gap adjusters, hydraulic track pullers, sleeper internal combustion bolt wrenches, hydraulic rail pullers, high-speed rail equipment, etc.
Since its inception, Jinzhou Shuangxing products have received support and favor from the majority of users with their excellent product quality, perfect after-sales service, reasonable sales prices, and good reputation, credibility and business philosophy. The company's products are widely used in coal, petroleum, metallurgy, electric power, chemical industry, machinery and other industries, and are supplied by many railway suppliers and sold throughout the country and Southeast Asia.
Type internal combustion rail drilling machine_Picture_Production_Price
The electric rail drilling machine is a special tool for drilling railway rails. It can be used on the line and in construction and large and medium-sized line maintenance operations. It is a portable machine with light weight and small size. When working, the card is firmly installed, accurately and quickly removed, which can effectively ensure driving safety.
Technical parameters of internal combustion rail drilling machine:
, Gasoline engine power: ./r.
, Spindle speed: r.
, drilling diameter range: .~(twist drill bit)~(hollow drill bit).
, aperture accuracy:..
, overall machine quality.
Operation steps of internal combustion rail drilling machine
First fill the high-pressure kettle with water.
Check whether the clamps are loose and lock the clamps on the rails.
After starting the gasoline engine and preheating it, apply a large throttle to bring the drill bit speed into a rotating state.
During the drilling process, use appropriate force when feeding and do not use too fast or too hard. If you find abnormal rotation, reduce force to prevent overloading.
After the drilling operation is completed, check whether all parts of the machine are intact. Then store it in a well-ventilated place to prevent rust.
Type internal combustion rail drilling machine_Picture_Production_Price
Preparation before operation of rail drilling machine:
Installation of drill bit: Install hollow drill bit or twist drill bit according to the needs of on-site work. The specific method is as follows:
This manual takes the installation of a hollow drill bit as an example. Push the feed lever ⑨ toward the gasoline engine to the end.
Then lift the clamp lever ⑥ toward the gasoline engine.
Lift the drilling machine, use a wrench or your fingers to loosen the set screw at the spindle sleeve, install the drill bit core into the drill bit, then align the flat parts of the two belts with the two set screws, insert them into the spline shaft and After being close to the root of the spline shaft, tighten the set screw to complete the installation. This machine tool is shipped with a hollow drill bit from the factory.
Drill bit disassembly: Lift the drilling machine according to the above steps and use a wrench to rotate the bolt counterclockwise to remove the drill bit from the spindle sleeve.
After the operation, you must use the wrench that comes with the machine (if you use other wrenches to cause damage to the machine, you will be responsible for the consequences) to remove the drill bit and apply thin oil or rust inhibitor to the threaded hole.
Installation of positioning blocks:
Choose the positioning block ⑩ that is the same as the rail model given (this positioning block is a combination dual-use positioning block, that is, and and combination are respectively marked with,, and numbers close to the rail side. Indicates which rail type is to be drilled.
.Use of water injection bucket:
Align the handle with the groove at the mouth of the water injection bucket and press down to the root. Rotate the handle counterclockwise until the pressing device is unscrewed and then Fill the water injection bucket with coolant (to prevent the drill bit and the drilled rail hole from rusting). After filling the coolant, tighten it clockwise and then rotate it counterclockwise at a small angle. Take it out from the groove at the mouth of the water injection bucket and press the handle back and forth a few times (towards Pressurize under the water injection bucket) Insert the water pipe into the oil pipe in the fixture of the drilling machine. Hold the water injection bucket with the handle of the water outlet valve, press the water valve with your thumb downward and push it forward to open the state. At this time, press down on the drill bit core to confirm the coolant The next operation can only be carried out after it flows out from the drill bit.
Introduction and installation of the positioning ruler:
This positioning ruler is divided into models such as,,,, etc. The corners of the positioning ruler are marked respectively. Each Each positioning ruler has a positioning groove, which is processed according to the standard hole spacing of the rail.
Pull the ruler locator back and insert the positioning ruler ⑤ into the clamp body and under the first groove.
, add. Fuel and lubricating oil:
Filling the fuel tank: first unscrew the fuel tank cap and add # or more unleaded gasoline or ethanol gasoline, then tighten the fuel tank cap
Filling the lubricating oil: first unscrew the lubrication chamber Fill the fuel tank cap in summer #Gasline oil filling in winter -# When the gasoline oil reaches the mark on the scale, do not add less or more gasoline. Tighten the fuel tank cap. Use your fingers to press the gasoline engine carburetor and soak it for a few times until it is carbureted. The storage bubble of the device is filled with gasoline.
When the temperature is lower than ℃, usually close the damper first (lift it upward), increase the throttle to / position, quickly pull the starting disk, slowly put it back, wait for the gasoline engine to start, and slowly Open the throttle to the maximum (press down) and slowly increase the throttle and run it at idle for a few seconds. Check whether the transmission part is flexible and whether there is any abnormal noise. Whether the screw connection is loose. Press the gasoline engine stop button to prepare for drilling.
Internal combustion rail drilling machine _Picture_Production_Price
Jinzhou Shuangxing after-sales service and delivery instructions
.Cost-performance explanation:
Under the same product quality conditions, our company will not give it at the expense of reducing performance or changing product parts. The lowest and most realistic price. (Product production configuration can be carried out according to customer requirements)
. Delivery instructions:
Delivery according to the supply period. If there are special circumstances that require early delivery, our company will do so within a limited time. Within the scope, we will organize personnel to increase production intensity, implement production, installation, debugging, packaging and other processes to strive to meet your company's requirements.
. Product delivery comes with instructions:
① Product manual and maintenance manual
② Product certificate
③ Instructions for purchased parts
④ Consumable parts and their list (the source may vary depending on the model)
.After-sales service scope:
The product warranty period is one year If the product has quality problems during the warranty period, our company will provide the fastest repair without any cost. If parts need to be replaced outside the warranty period, our company will only charge the cost.
. Tracking products:
Our company will have at least one technical follow-up visit every month after the product is sold to track the use of the product and record it so that any problems can be dealt with in a timely manner and strive to achieve customer satisfaction.
Jinzhou Shuangxing produces and sells the following products
☆Railway transportation: internal combustion tamping picks, tamping machines, hydraulic rail drilling machines, hydraulic rail drilling machines, manual rail drilling machines, rack type Track starter, hydraulic track starter, rail cutting machine, square sleeper, hydraulic rail straightener, rerailer, universal gauge ruler, rail grinder, square ruler, rail transport car, etc.
☆Track accessories: stoppers Plate, turnout, turnout accessories, turnout tie rod, track gauge ruler, track gauge ruler, track gauge ruler, track gauge ruler, anchor rod, anchor drill rod, pneumatic drill rod, turnout pad, track plywood, road stud, insulating plywood, Crossover switches, pads, composite rubber pads, track fasteners, track clamps, gauge pull rods, rail guard gussets, line gusset bases, insulated gauge rods, gussets, twist drill pipes, coal drill pipes, twist drills Rod, connecting sleeve, chain spreader, wind drill, anchor pallet, pallet, nylon baffle seat, manual switch, manual bender, bender, bending machine, rail pressure plate, fish tail plates, fishtail bolts, etc.
Jinzhou Shuangxing sales network Hebei, Shanxi, Inner Mongolia, Liaoning, Jilin, Heilongjiang, Beijing, Tianjin, Shanghai, Jiangsu, Zhejiang, Anhui, Fujian, Jiangxi, Shandong, Henan, Hubei, Chongqing, Sichuan, Guizhou, Yunnan, Shaanxi, Gansu, Ningxia, Xinjiang and other places.
Remarks: The above content has related product parameters and pictures provided by Jinzhou Shuangxing Railway Machinery Co., Ltd. for reference only. Specific products may have different sources due to different production batches. Please contact the sales staff for specific details.
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【NZG-32 internal combustion rail drilling machine provides exquisite workmanship】are provided by member【Jinzhou Shuangxing Railway Machinery Manufacturing Co., Ltd.
】,By Titker Trade Network members 【Jinzhou Shuangxing Railway Machinery Manufacturing Co., Ltd.
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!