- 150KW:
- 定制
- 150KW:
- 定制
- 150KW:
- 定制
. . .AC load box is mainly used for AC power supply testing, generator sets and other occasions. Simulating resistive and capacitive loads can detect the performance of generator sets and other AC power supplies under different loads. The power input is uniformly optimized and segmented to meet the needs of different loads.
. .
. . .The resistive load adopts new power consumption components. The resistor is heat-shrunk and sealed and installed in a stainless steel tube. The outside of the steel tube is equipped with an insulating heat sink, which has good moisture-proof and anti-corrosion properties, good heat dissipation, and insulation. High performance, safe and reliable. The resistance element has high power density, no red heat phenomenon, and has an independent cooling fan to ensure the heat dissipation and service life of the entire system.
. .
. . .This load overcomes the water resistance test system's inability to accurately control its resistance value. Water is easy to boil and scale, so sudden load/sudden load reduction tests cannot be performed, and it is difficult to control. . It is an upgraded product of water resistor. This product has high safety and low maintenance cost. Low noise and strong overload capability.
. .
. . . The fan adopts a small imported fan, which has the characteristics of large air volume, good heat dissipation and low noise.
. .
. . . The above features make the whole machine superior to imported products in terms of safety, reliability and noise reduction.
. . ., relevant standards and specifications
. . ."General requirements for safety of power supplies, reactors and similar products"
. .."General technical conditions for mechanical safety of mechanical and electrical equipment" 》
. . .《General Principles of Low Voltage Switchgear and Control Equipment》/
. . .《Marine Diesel Generator Sets》/
. . .《** General Specifications for Internal Combustion Engine Loads》
. . ."**General Specifications for AC Mobile Loads"
. .."General Technical Conditions for Industrial and Medium Frequency Mobile Loads"
. .."**General Test Methods for Internal Combustion Engine Loads"
. . ."Hygienic Standards for Design of Industrial Enterprises"
. .
..AC load|DC load|Dry load|Load box customization|Load box
. . . 2. Main functions and Specifications
. . .), access load voltage AC frequency/.
. . .Power factor adjustable
. . .), installed capacity
. . .), working power supply single-phase/.
. . .), cooling method forced air cooling (lower air inlet, upper air outlet)
. . .), display mode digital real-time display of load voltage, current, active power, reactive power, power Factor, frequency and other parameters, measurement accuracy.%.
. . .), load measurement accuracy %), insulation strength (the insulation of the load cabinet complies with relevant regulations, resistance withstand voltage/minute).
), the load protection function has automatic overheating protection.
. . .), working mode continuous working
. ..), control mode panel manual control, segmented manual adjustment (main circuit contactor mode control, air switch segmented adjustable )
. . .), applicable ambient temperature range ℃ ~ + ℃
. . .), (length, width and height)**
. . 3. Resistive load module alloy power resistor Rod
. . The resistive load module is made up of several special alloy resistors connected together. As a power consumption component, alloy resistors are processed and manufactured from special alloys. The outside is a heat sink and the middle is filled with an insulating medium. The resistor is packaged in it to meet the needs of load testing.
. . .Alloy resistance has good insulation performance, high heat dissipation performance, uniform heat conduction, operating temperature is only the design temperature and small temperature drift, stable resistance value, and no red heat during long-term operation. It is acid-resistant, salt spray-resistant, rain-proof, moisture-proof and corrosion-proof, and can be used all day long.
. . .The resistive load module uses technology to fix the alloy resistor on the insulating material board. The entire module is sealed and separated by internal insulation and insulation boards to ensure insulation and safety even in humid weather. property, and can prevent short circuit accidents caused by the decrease in internal resistance of adjacent resistors.
. . .4. Inductive load module reactor
. . .The inductive load module is composed of several fixed reactors. Its main purpose is to adjust the inductive load during the load test and cooperate with the resistive load. The load power factor can be adjusted to simulate the actual working status of the generator set.
. . .The fixed reactor is made of a fixed iron core and three-phase copper windings (aluminum wire can be used here). It is manufactured with advanced technology and treated with waterproof, salt spray and mold resistance. The iron core is made of high-quality cold-rolled oriented silicon steel sheets, and the air gaps are separated by epoxy layer glass cloth plates to ensure that the reactance air gap does not change during operation. The coil and iron core of the reactor are assembled into one and then pre-baked, air-dipped in paint, and dried and cured to firmly combine the coil and iron core of the reactor. It has small loss, high efficiency, low temperature rise, and can operate stably for a long time under rated load. No noise, no pollution, no need for daily maintenance and long service life.
. .AC load|DC load|Dry load|Load box customization|Load box
. .5. Capacitive load module
. .AC voltage capacity.~High voltage AC filter Capacitor applications, high frequency, high power grid-connected converter filtering.
. . . 6. Service
. . Service process
. . .The specific process and content are as follows
. . .Technical solutions are proposed according to the needs as a reference for users Plan.
. . .The parties to the technical agreement will negotiate based on the actual situation and agree on a final technical agreement based on the plan. The design and production of the system will be carried out strictly in accordance with the final agreement.
. . . Design the structure, circuit and software according to the technical agreement.
. . .Production and assembly are carried out according to the design drawings.
. . . Pre-factory inspection conducts strict debugging and inspection of the equipment in accordance with the technical agreement and relevant standards. If the equipment does not meet the standards, it will not be released from the factory. Users can also send technical personnel to the production base for acceptance.
. . .Transportation Safely transport the system to the location designated by the user.
. . . On-site service dispatches technical personnel to the user's work site to assist in the installation, debugging, training, and acceptance of the system, and participate in the first formal test.
. . Lifetime service provides lifelong technical services to solve user problems.
. . Quality Management
. . .In the system design, production and inspection process, the factory takes the following measures to ensure that the system quality is qualified and can meet user needs
. . .System Design and production are carried out entirely in accordance with the formal technical agreement agreed upon by both parties.
. . . Before production, the equipment outline drawings are provided to the user. Production can only be based on the drawings after confirmation and approval.
. . .During the production process, a dedicated inspection department conducts strict quality inspection on the raw materials used in the system.
. . .Carry out full quality tracking during component processing, assembly, and debugging, and establish product files.
. . . Ensure that all accessories are advanced, brand new, complete, reasonably arranged and in compliance with relevant national standards. The inside of the equipment is clean, the wiring is neat, all wiring conforms to the drawings, and the interfaces and switches are correctly and clearly marked.
. . .Strictly follow the requirements of the drawings and relevant standards and specifications to verify the functions and parameters of the system to ensure that the final product can achieve all the content agreed in the technical agreement.
. .AC load|DC load|Dry load|Load box customization|Load box
. .Acceptance
. .Both parties can accept the system through actual operation. After the system is produced, the user will be notified days in advance to conduct performance experiments before leaving the factory. Only after passing the acceptance inspection can it leave the factory. The following matters must be observed during acceptance
. . The factory acceptance test shall be carried out in accordance with the technical agreement and the acceptance outline agreed upon by both parties.
. . .The factory appointed technical backbones to be on site to provide technical services and training.
. . . When using the system for the first time, provide comprehensive guidance to the technical personnel involved in user acceptance and teach how to use it.
. . .Guide users to install and debug according to technical information and drawings.
. . .The factory is responsible for solving problems that arise during production and manufacturing.
. . . The factory acceptance test is only a functional test, and the load test is the final acceptance item and is carried out during the user's formal load test
. .
. . On-site service
. . . After the system leaves the factory, the factory will dispatch technical personnel to follow and provide users with complete on-site services, including the following
. . . The factory is responsible for the transportation of the system , ensuring that all system accessories are delivered to the user's designated location before the agreed date.
. . .The factory sends technical personnel to assist users in completing the system installation and debugging process, and participate in the first test.
. . .The factory provides relevant training for users’ technical personnel to meet the needs of daily work and maintenance of the system.
. . .During the training period, the factory assigns experienced technical personnel as guides and develops a detailed training outline with theoretical and practical content.
. . . Ensure that trained personnel understand the working principle, operation methods, precautions, response methods under various abnormal conditions and daily maintenance methods of the system.
. . Lifetime service
. . . If users encounter any technical problems during the use of the system, they can call the after-sales hotline to contact us. The manufacturer must promise to provide lifelong technical services, including the following content
. . The system quality guarantee period is calculated from the date of system acceptance and lasts for years.
. . . If there is any quality problem with the system during the warranty period, the factory will provide free repairs.
. . . After the user encounters a problem and contacts the manufacturer, a reply is guaranteed within hours.
. . .If it is necessary to dispatch technicians to the site to solve the problem, they are guaranteed to arrive at the site within hours. The service personnel will not evacuate until the problem is solved.
. . .Users can enjoy free technical consulting services permanently.
. . .Save complete product technical files for users.
. . .After the one-year warranty period, users will be provided with lifetime paid maintenance services, and only the cost will be charged.
. . If necessary, the manufacturer will upgrade the system for the user at the best price.
AC load|DC load|Dry load|Load box customization|Load box