The main products of European moldings include carvings, window casing lines, waist lines, door casing lines, cornice lines, and corbels , Roman columns, door trims, decorative components and other products, and can accept customized drawings. So, do you know how to install European style lines? Next, the elevator door cover line will tell you how to install the European style lines. I hope it can help you.
. On-site investigation
First, conduct an inspection of the construction site to check the condition of the base surface, which is required to be flat, dense, and pollution-free. For base surfaces that do not meet the requirements, coordination must be made with the relevant parties, the base surface must be renovated, and the base surface must be inspected and confirmed again.
. Pull wire
Measure relevant dimensions on site.
. Drawing confirmation
Confirm the size and shape of the final product based on the actual conditions on site and in conjunction with the design drawings. If there is any inappropriateness, suggestions for modification must be made in a timely manner and sent to the owner and designer for confirmation.
. Product Production
Line products are produced in factories. The factory must convert the engineering drawings into processing drawings, arrange detailed product processing sequences and production plans, and arrange the production schedule closely based on the actual needs of the site. Respond promptly to on-site feedback and make timely adjustments according to the situation.
. Spring line
According to the construction drawings, pop up the positioning line (center line or edge line) at the location where the component is to be installed.
. Line cutting
The products produced by the factory are all fixed length. When installing on site, try to use the entire line. The lines that need to be cut are cut with a special saw. The cut surface should be as smooth as possible, and any uneven areas should be smoothed with sandpaper.
. Preparing mortar on site
① The mortar used in construction is a special polymer-bonded mortar specially formulated for the requirements of the base surface
② Use a hand-held electric mixer to stir during construction. The mixing must be sufficient, even, and of moderate consistency.
③After the mortar is prepared, it must be left to stand and stir again before use. The mixed mortar should be used up within an hour.
. Paste lines
The polystyrene component adhesive uses high-quality composite bonding mortar. Small lines are pasted using the full-adhesive method, and large lines are pasted using the point-and-circle combination method. The components are squeezed hard to completely fit the wall. Seam width is no larger than . The bonding seams should be hooked as they are glued, the gray seams should be full, and the surface of the component should be kept clean.
. Install anchor nails
When the thickness of the line is reduced, after the line is installed in place and maintained for an hour, use an impact drill to drill holes at the set parts of the line. The holes pass through the line and the exterior wall insulation layer, and enter the base wall. . The outer opening of the hole is slightly lower than the inner opening to prevent rainwater from entering the wall system. Anchor nails are installed into the holes, and the discs of the anchors must be embedded in the surface of the line and must not be exposed.
We treat our work and customers with full enthusiasm and unlimited passion, and we are willing to use diligent efforts to create a better tomorrow with you
Shandong Jinan Haohui Building Materials Company
Contact Manager Hao< br/> Contact number
Mobile phone
Imitation marble stone molding lines