- 型号:
- ZLJ700探水钻机
- 产地:
- 山东济宁
- 包装:
- 木箱
The tunnel drilling rig is the deepest and most efficient tunnel drilling rig among the series of tunnel drilling rigs that drills holes for water exploration and coring. Because it is the largest specification among the series of tunnel drilling rigs, it can drill cores of about meters. It is the one with the largest torque among the tunnel drilling rigs. It has high power, high efficiency, fast drilling speed and deep drilling depth.
Tunnel water exploration drilling rigs are divided into two types: spiral differential feed type and power head type (mechanical type and fully hydraulic type)
Features. Large torque, the drilling direction can be easily adjusted within a range of ~ degrees Adjustment. .It has good disassembly properties, small size and light weight, and is suitable for working in coal mines and tunnels with complex operating environments.
Functions: Drilling water holes, grouting, coring, prospecting, and mining holes.
Parameters of coring grouting drill
Rated voltage
/
Vertical shaft revolutions
Current
//
Weight
/>
Stroke
Power
Use drill pipe
/
Speed
Output torque (˙)
Safety warning
) Do not replace electrical explosion-proof components and safety accessories at will.
) The hydraulic system must not leak when the drilling rig is working. Otherwise, it should be stopped immediately and replaced, and the leakage should be dealt with in a timely manner. It is strictly prohibited to adjust various pressure regulating valves at will.
) During maintenance, the power must be cut off before the box cover can be opened for maintenance work.
Maintenance and maintenance of water exploration drilling rig
When the oil temperature in the tank exceeds ℃, it should be stopped for cooling, and the work should be continued after the oil temperature drops.
Before each relocation, after removing the rotor and oil pipe, use a wire plug to block the oil port.
All covers and dust covers must be kept intact and cannot be removed casually.
The clutch must be disconnected when changing gears.
When starting vertical shaft drilling, you must first lift the drilling tool away from the bottom of the hole, and then drill after the operation is normal.
Factory address Liying Industrial Park, Rencheng District, Jining, Shandong
Sales phone number
Consultation