- 最大钻进深度:
- 200
- 起拔力:
- 52
- 钻孔倾角:
- -90~+90
The main shaft of the drilling rig power head and the water shaft are integrated, reducing the hexagonal shaft and hexagonal sleeve shaft of the traditional drilling rig
The drilling rig adopts a new special sealing ring , thereby reducing the failure rate of oil leakage in the drilling rig.
This drilling rig is equipped with a spiral drill pipe with wide blades, hollow square buckles and can be rotated forward and reverse. It can drill with water or pressure air to remove slag.
. When the drilling rig leaves the factory, it can be equipped with a tapered smooth drill pipe or a tapered spiral drill pipe or a square buckle that can be rotated forward and reverse. It can be equipped with a hydraulic holder and a manual clamp that can quickly disassemble the drill pipe. The holder can realize the multi-purpose use of one machine when purchasing a drilling rig for coal mines
According to the user's requirements, the drilling rig can be equipped with a dedicated hydraulic sealing pump. After drilling, the hydraulic motor of the drilling rig's power head can be The quick-change joint is connected to the hydraulic motor of the sealing pump for quick hole sealing.
The drill frame has two structural forms: column frame and seat frame. Different drill frames can be selected according to the tunnel section of the coal mine and on-site usage conditions. This drilling rig adopts a hydraulic transmission mechanism, which has large drilling capacity, fast speed, simple operation, stable and reliable operation, and easy mobile installation. It solves the problems of blowout holes, hole collapse, and drill stuck during the drilling process of soft and protruding coal seams. The drilling rate is high and the drilling depth is deep.
When the drilling rig is equipped with a high-pressure water generator and a high-pressure sealed drill pipe, it can cut coal seams with low gas permeability, thus improving the gas drainage efficiency and greatly shortening the drainage time.
> Serial number
Project
Maximum drilling Depth
< br/>
Maximum torque
Rotation speed
Pull-out force
Drilling inclination angle
~+
~+
Motor power
Working medium
Apply thick hydraulic oil
Apply thick hydraulic oil
Host overall dimensions
**
**
Host overall quality< br/>
Overall machine weight