1. The importance of the project Real stone paint is of great importance as an exterior wall decoration. Only first-class products and careful construction can perfectly combine the two and create a first-class sample project. We will implement a comprehensive quality management system in accordance with the requirements of the Chuangbei Project and strive to achieve first-class models and standardized projects.
2.
Construction steps and methods
Check the flatness of the main wall surface and whether the lines are straight and clear. The surface of the base layer is required to be smooth and dry (the cement mortar surface should be maintained at least 3 days without floating dust, Asphalt and other stains, and <, moisture content <.
The old cement surface should be shoveled off the floating layer to ensure a solid base, remove impurities on the wall, repair the porous and rough base surface, and then grind it with a grinding wheel Flat.
,
According to the requirements of decoration, use cement mortar or tape paper to divide the base surface into the required graphics (each divided surface should not be larger than .
, primer construction and Use a special neutralizer to neutralize the alkaline wall surface to ensure that the wall surface after construction is not overly alkaline. The dosage is approximately /. For paint construction, rinse the neutralized wall surface with clean water and wait until the wall surface is dry. Finally, carry out primer construction, primer dosage/
The coating can be constructed by brushing, rolling or spraying.
,
Main coating (real stone paint) construction After the base coat is completely dry (it usually takes an hour), construction can begin. According to different decoration requirements, test spraying is performed first to determine the pressure, nozzle diameter and spray volume required for construction. Generally speaking, it is advisable to spray the main color coating in two times. Before the first layer of coating is dry, you can spray the second layer. The main color coating can use a double-tube real stone paint spray head
Or single-tube real stone paint spray
head
Spray in batches.
,
Auxiliary treatment: Remove the dividing tape, and perform jointing treatment according to the decoration needs.
,
/> The construction of the overcoat (varnish) can only be carried out after the main coating is completely dry (usually takes about an hour). It can be brushed or rolled, and the amount of varnish is /.