Hello and welcome toTitker Trade Network!
Railroad Maintenance Tools, Hydraulic Road Ripper, Hydraulic Rail

free member

Gantry crane

total supply
1111 台
MOQ
1 台
brand
中运
area
ShandongJining City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Gantry crane

¥1.00/台

Slewing crane

¥1.00/台

Gantry crane, gantry

¥1.00/台

Portal crane

¥1.00/台

Electric hoist overh

¥1.00/台

Wall traveling crane

¥1.00/台

Shop information

area:Shandong Jining City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shandong Zhongyun Logistics Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Gantry crane
Crane, gantry crane, traveling crane, crane manufacturer, crane wholesale
There are too many unsatisfactory things in life, because people always like to ask for things. If we only think about harvest, we will lose a lot of happiness. No matter in anything, we should be more fearless in giving, and we must believe that giving will be rewarded, whether the reward is tangible or intangible.
The gantry crane is a bridge-type crane in which the horizontal bridge is set on two legs to form a gantry shape. This kind of crane runs on ground rails and is mainly used for handling and installation operations in open-air storage yards, docks, power stations, ports, railway cargo stations and other places.
The hoisting mechanism, trolley operating mechanism and bridge structure of the gantry crane are basically the same as those of the bridge crane. Due to the large span, most crane operating mechanisms adopt separate driving methods to prevent the crane from skewing and increasing resistance and even causing accidents. The lifting trolley of the gantry crane runs on the bridge frame, and some lifting trolleys are just jib-type cranes. The legs on both sides of the bridge are generally rigid legs. When the span exceeds meters, one side is often a rigid leg, and the other side is a flexible leg connected to the bridge through a ball hinge, making the gantry a statically determined system. It can avoid additional stress caused by lateral thrust under the action of external load, and can also compensate for the longitudinal temperature deformation of the bridge. The gantry crane has a large wind area. In order to prevent sliding or overturning under the action of strong wind, it is equipped with an anemometer and an operating system. Crane rail clamp with mechanism interlocking. The bridge can be either without cantilevers at both ends or with cantilevers at one end or with cantilevers at both ends to expand the operating range. The semi-gantry crane bridge has outriggers at one end and no outriggers at the other end, and runs directly on the high platform.
Safety Precautions
When lifting heavy objects, the hook wire rope should be kept vertical, and the lifted object is not allowed to be dragged diagonally.
The center of gravity of the lifted object should be determined and tied firmly. Sharp angles should be padded with wooden skids.
The crane is not allowed to rotate before the heavy object is lifted off the ground.
When lifting or lowering heavy objects, the speed should be even and steady to avoid sudden changes in speed, which may cause the heavy objects to swing in the air and cause danger. When dropping heavy objects, the speed should not be too fast to avoid breaking the heavy objects when they hit the ground.
When the crane is lifting heavy loads, try to avoid the lifting arm. When the boom must be raised and lowered while lifting, the lifting weight shall not exceed the specified weight.
When the crane is rotating while lifting a heavy load, you should pay close attention to whether there are any obstacles around it. If there are any obstacles, try to avoid or remove them.
No one should stay under the crane boom, and try to avoid people passing through.
When two cranes operate on the same track, the distance between the two cranes should be greater than 1.
When two cranes lift an object together, the lifting capacity shall not exceed the total lifting capacity of the two cranes, and the lifting and lifting movements of the two cranes must be consistent.
The lifting luffing wire rope needs to be inspected once a week and records should be kept. The specific requirements must be implemented in accordance with the relevant regulations on lifting wire ropes.
When the truck is running or turning without a load, the hook should be above the ground.
When the wind force exceeds Level 6, work should be stopped immediately. The boom should be turned to the downwind direction and lowered appropriately, and the hook should be hung firmly. The gantry crane must install iron wedges (rail stops) and raise the hook to the upper limit. At the same time, close the doors and windows, cut off the power supply, and pull up the cable wind rope. This should also be done after daily work.
It is strictly prohibited on the crane platform Stack miscellaneous objects to prevent them from falling and injuring people during operation. Frequently used tools should be placed in a special tool box in the operating room.
During operation, sudden speed changes or reversing are not allowed to avoid causing heavy objects to fly in the air. It is not allowed to swing, and it is not allowed to operate more than two operating mechanisms (including auxiliary hooks) at the same time.
When driving, the operator's hands must not leave the controller. When a sudden failure occurs during operation, measures should be taken to safely land the heavy objects. , then cut off the power supply and perform repairs. Inspection and maintenance during operation is strictly prohibited.
The crane shall not be lifted if one of the following conditions occurs
The weight exceeds the rated lifting capacity of the crane.
The weight of the weight is unknown.
The signal is unclear.
The heavy objects are not tied firmly.
Open-air operations are exposed to severe weather such as strong winds above level 6 (level 5 above the beam), heavy rain and fog.
The lighting is not sufficient for night operations. Good.
Cable-stayed.
The wire rope is severely worn and broken, and someone is doing maintenance on the crane or in the machine room.
Because the specific models of product production batches are different, the above pictures are for reference only. Details can be Contact our sales staff for detailed verification.
Give Zhongyun a trust and you will be 100% satisfied!
Shandong Zhongyun, your reliable partner on the road of life!
We believe that only by moving forward Only by entering the orbit of international standards can we have unlimited room for expansion. China Transport sincerely looks forward to happy cooperation with you.
Contact person Li Baodan
Mobile number Company landline
Postal code
Corporate address No. Kaiyuan Road, High-tech Zone, Jining City, Shandong Province
"Gantry crane"Related Products
Related categories
plastic robot oil equipment Packaging Equipment Packaging forming machinery Printing Equipment Prepress processing equipment Post-press processing equipment agricultural machinery Food and beverage processing equipment Sewage treatment equipment Cleaning and cleaning equipment energy saving equipment Air purification equipment Noise reduction equipment garbage incinerator Generator/generator set electric motor Low voltage electrical appliances High voltage electrical appliances Distribution and transmission equipment Textile equipment and equipment Leather processing equipment Paper processing machinery Shoemaking machinery Painting equipment Papermaking equipment and accessories Clothing machinery and equipment furniture manufacturing machinery Craft gift processing equipment Ceramic production and processing machinery Computer product manufacturing equipment Home appliance manufacturing equipment Toy processing equipment Other industry-specific equipment machine tool valve Pump Transmission Parts industrial belt Filtration equipment filter material Bearing spring Fasteners/connectors Seals Mold Tools/fixtures Pneumatic Components Hydraulic Components Machine tool accessories Fans and exhaust equipment Compression equipment Compression equipment accessories Reducer/speed changer internal combustion engine Testing Machine Welding materials and accessories brake Welding and cutting equipment Welding auxiliary machine Engineering machinery/construction machinery Mineral processing equipment Smelting equipment Metal forming equipment Electronic product manufacturing equipment Industrial control systems and equipment Electric heating equipment Commercial special equipment Financial special equipment hotel equipment Industrial lubricants 换热、制冷空调设备 Industrial boilers and accessories workshop equipment 建材生产加工机械 gas equipment Casting and heat treatment equipment Non-destructive testing instruments Refrigeration equipment Rubber machinery Conveying equipment Mining loading and unloading equipment Mining conveying equipment Mining construction equipment Inventory chemical equipment Crystallization equipment Mixing equipment Chemical experimental equipment Chemical equipment accessories Chemical pipelines and accessories Chemical molding equipment Complete sets of chemical equipment Drying equipment Industrial humidifier Crushing equipment Separation equipment Mechanical measuring instruments reaction equipment Geological and mineral survey equipment Mass transfer equipment heat transfer equipment Storage and transportation equipment glass machinery Second hand machine tools second hand boiler Second-hand construction machinery Inventory equipment and industrial supplies Hydraulic machinery and accessories Ironing and washing equipment
Related Information
Single person field geological explorati Aerial vehicle, street light vehicle, la Bridge rubber pipe automatic pipe thread Terrazzo floor smoothing machine Terrazz Terrazzo floor waxing machine electric w 600 type multifunctional dust cleaning m Road gasoline cutting machine Road seami Shandong Jining 8-ton single drum vibrat Shandong Jining 5-ton single drum riding TY-18C walk-behind single-wheel diesel r Double drum ride-on vibratory roller 850 Heavy-duty walk-behind single-wheel dies TY-600A Walk-behind gasoline two-wheel r Machinery for demolition of concrete fac Large-scale noiseless demolition equipme
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Gantry crane】are provided by member【Shandong Zhongyun Logistics Co 】,By Titker Trade Network members 【Shandong Zhongyun Logistics Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network