Hello and welcome toTitker Trade Network!
ADSS cable fittings, OPGW cable fittings, OPPC cable fittings, pre

free member

OPGW anti-vibration hammer

total supply
80000 套
MOQ
2 套
brand
恒力达
area
HebeiBaoding City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

High quality product

¥1.00/套

OPGW optical cable c

¥1.00/套

High quality ADSS pr

¥1.00/套

Pre-twisted wire pow

¥1.00/套

ADSS optical cable h

¥1.00/套

Pretwisted conductor

¥1.00/套

Shop information

area:Hebei Baoding City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Baoding Henglida Line Equipment Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
材质:
热镀锌
The splicing, residual cable and splicing box installation
The splicing of optical cables is generally performed on the ground. When welding, pay attention to the temporary fixation to prevent it from shaking due to wind and other factors, which will affect the welding quality. After completion, the connection box and remaining cables must be fixed. The installation position of the remaining cables is, for the gantry, meters above the ground. For the connecting tower, it is generally installed at the intersection of the tower diagonal materials ~ meters above the ground
The installation position of the splice box, for the gantry, is installed at Meters above the remaining cable rack. For connection towers, the installation location is usually ~3 meters above the remaining cables.
Installation of anti-vibration hammer: It is recommended that the first anti-vibration hammer is installed on the inner twisted wire, and the distance between the center of the anti-vibration hammer and the end of the twisted wire is -. When the second and third anti-vibration hammers are installed outside the pre-twisted wire, they should be lined with protective strips. The construction should be carried out in strict accordance with the technical requirements of the construction supervision. When the number of anti-vibration hammers is more than two, the number of anti-vibration hammers between the two anti-vibration hammers should be The distance between is.
Anti-vibration hammers have different sizes. When installing, the large hammer head should face the side of the tower. - Anti-vibration hammer movement
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【OPGW anti-vibration hammer】are provided by member【Baoding Henglida Line Equipment Co 】,By Titker Trade Network members 【Baoding Henglida Line Equipment Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network