- 密度:
- 2.2-2.6
- 弯曲强度:
- ≥58.8
- 吸水率:
- ≤0.2
. For example, the wind in the construction environment is not allowed to come into contact with a large amount of water, water vapor and fire sources. Rainproof and sunproof sheds should be built during outdoor construction. The appropriate construction environment temperature for brick lining is ℃ ~ 3 ℃. The relative humidity should not be greater than 1. When the construction environment temperature is lower than ℃, heating and insulation measures should be taken. Before construction, all required raw materials should be prepared according to the requirements of the construction tasks and placed in designated warehouses. For flammable and explosive raw materials, they should be placed in fire-proof and explosion-proof warehouses.
.
. In addition, the editor also learned that construction equipment should be prepared before construction: such as cutting machines, manual grinding wheels, etc. In order to control the temperature and temperature of the construction environment, a thermometer and hygrometer should be provided at the construction site. Prepare construction tools such as scales, measuring sticks, wire brushes, hand hammers, dust knives, flat shovels, etc.
.
. Last but not least, prepare enough labor protection supplies and fire-fighting equipment before constructing acid-resistant bricks. After all, safety is the most important thing.