- DN:
- 32
- DN:
- 40
- DN:
- 50
1. Performance
Wide spray range, which can completely cover the area within the rotation radius of the tower crane.
, suppress dust on construction sites, control pollution and reduce haze, and prevent and reduce fires.
Cool the ground in hot weather and atomize concrete for maintenance.
2. Composition
Tower crane spray dust reduction system includes: special rotating universal joint for tower crane,
bracket, water pipe, filter, tee, union, adjustable nozzle, etc.
R pipe, pipe or galvanized steel pipe should be used as the main line.
Water intake from the tower crane high-altitude sprinkler system: it can be connected to the municipal pipe network for water intake
or it can be combined with the circulating water recovery system and sent to the
tower crane spray system by a pressurized pump.
3. Pipeline Settings
According to the length of the tower crane's rotating arm, generally install a nozzle at an interval. According to the required flow rate and pressure of each nozzle, select
the models of water pumps, water pipes and universal joints. Its layout principle must meet the needs of the site.
Set the universal joint of the sprinkler system according to the axis core of the tower crane universal wheel. The pipe support system and universal joints and the tower crane universal wheel axis must
remain coaxial and concentric.
Since welding of standard parts of the tower crane is strictly prohibited, two fixed supports are installed on the special rotating universal joint, which are connected to the universal joint through screw buckles. The fixed pipe support is seamlessly connected to the tower crane using screw buckles.
4. Precautions
Regularly check whether the pipeline support system and the universal joint fixing bracket are displaced, and whether the fixing screws are tightened.
When the main pipeline of the sprinkler system is laid for a long time, pressurized water pumps should be installed at intervals.
In order to prevent pipelines from freezing in the northern region in winter, all main pipelines must be buried to a minimum depth and have heating measures in place.
In order to ensure the quality of spray water, a reclaimed water treatment system can be added according to actual conditions. :../Actual effect:../Tower crane list:../Tower crane list