Hello and welcome toTitker Trade Network!
Changsha colored asphalt construction Xiangtan colored asphalt con

free member

Changsha Xiangtan Zhangjiajie Hengyang Jishou Yueyang Permeable Anti-slip Colored Asphalt Pavement Road Construction Company

total supply
0
MOQ
0
area
HunanChangsha City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Hunan Changsha City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Hunan Changsha Colored Asphalt Pavement Construction Company

  • name:梁经理(sir) 
  • phone:13908193641
  • mobile phone:13908193641
  • address:长沙机场路24号
Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Changsha, Xiangtan, Zhangjiajie, Hengyang, Jishou, Yueyang, Yiyang, Changde, Yongzhou, Zhuzhou, Loudi, Huaihua, Shaoyang and other regions have long-term professional undertakings of various bus stops, expressway anti-sliding, sidewalks, garden landscape roads, municipal Hot-mix and cold-paved non-slip colored asphalt construction projects such as roads, contact number: Liang
Colored asphalt road materials are used in bus lanes, landscape roads, tourist roads, sidewalks, bicycle lanes, park roads, community roads, parking lots , used in airport runway slides and other places, it can effectively beautify the environment and divide traffic sections. Welcome to call: Liang Yi, mixing of hot-mixed colored asphalt concrete
, mixing method of hot-mixed colored asphalt concrete The technical requirements are basically the same as those of ordinary asphalt concrete.
Before producing colored asphalt concrete, the mixing tank should be cleaned, and the cement transportation pipeline should be set up separately to prevent the original black asphalt from being contaminated.
In order not to affect the quality of bright asphalt, before construction and mixing, the storage temperature should be controlled at -℃ when the storage days are less than 3 days, and the storage temperature should be controlled at -℃ or normal temperature when the storage days are greater than 3 days. When cooling and hardening to normal temperature and reheating with a burner, in order to prevent the cement from being locally heated, please use interval heating until half of the stored cement is dissolved. (For example: heating up every hour, extinguishing fire every hour).
The construction temperature of colored asphalt binder should be determined by measuring the viscosity-temperature curve under ℃ and ℃ conditions. In the absence of viscosity-temperature curve data, you can refer to the following ranges for selection: -Ⅰ Colored asphalt binder heating temperature ~ ℃, stone heating temperature ~ ℃, mixing temperature ~ ℃, discharging temperature ~ ℃, paving temperature not lower than ℃, initial The pressing temperature is 3~℃, and the final rolling temperature should not be lower than ℃. - The heating temperature of colored asphalt binder is ~℃, the heating temperature of stone is ~℃, the mixing temperature is ~℃, the discharging temperature is ~℃, the paving temperature is not lower than ℃, the initial pressing temperature is ~℃, and the final rolling temperature is not lower than ℃.
In order to make the pigment evenly distributed, the mixing time should be reasonably determined. The mixing time is generally longer than that of ordinary asphalt concrete.
Strictly control the mixing temperature and mixing time. The difference in mixing temperature of each plate of materials is less than ℃, and the difference in mixing time is less than 3.
2. Construction of cold-mix colored asphalt
Cold-mix colored asphalt is also called cold-paved colored asphalt and cold-patched colored asphalt. This kind of cold-mix colored asphalt pavement can be constructed without heating. Cold-mix colored asphalt The price is much more expensive than hot-mixed colored asphalt, and the construction of this material relies entirely on labor, so the construction cost is relatively expensive. The selling point of cold patching is that it is easy to operate and does not require as large a machinery as hot patching. It also has relatively loose requirements on the environment, traffic control and surface treatment. First, draw a cordon to enclose the area that needs to be repaired, then clean the road surface to remove all foreign debris (soil, gravel, sand, etc.), sweep it with a broom, and then use a hair dryer to blow away the dust, sand, etc. and dry the road surface thoroughly. Then spray the colored asphalt mixture
After cleaning, according to the owner's requirements, if you want to retain the original markings, use tape of a specific size to protect the markings, arrows, text, etc. To protect the curb stones, clean them , greening is not polluted, etc., it is necessary to use a baffle to cover the edge of the spray boom to prevent pollution caused by mist fine materials splashed under strong pressure.
Use an artificially adjustable speed motor and a stirring blade to stir each barrel of asphalt emulsion, stir it evenly, and then add emery at a constant speed. According to different road conditions, the proportion of sand can range from the least without sand to the most added emery (paper cup at room temperature, no more than one pound at most). After adding, set the mixing speed to the fastest setting and keep stirring at high speed for minutes. , let the mixture be mixed thoroughly, and let the asphalt emulsion fully coat every grain of silica sand
. There are two methods of construction:
Direct spraying by machine (put curing agent), (recommended for heavy traffic),
Manual pushing and scraping method (put curing agent and emery), (recommended for light traffic such as sidewalks, bicycle lanes, etc.)
Machine direct spraying: add the mixture to the spraying equipment container at normal temperature, and pass it through the pipe Flow into the spray gun and spray evenly
After spraying or scraping, be sure to remove the tape quickly to avoid sticking to the road
After the construction is completed, it can be opened to traffic
"Changsha Xiangtan Zhangjiajie Hengyang Jishou Yueyang Permeable Anti-slip Colored Asphalt Pavement Road Construction Company"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Changsha Xiangtan Zhangjiajie Hengyang Jishou Yueyang Permeable Anti-slip Colored Asphalt Pavement Road Construction Company】are provided by member【Hunan Changsha Colored Asphalt Pavement Construction Company 】,By Titker Trade Network members 【Hunan Changsha Colored Asphalt Pavement Construction Company 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network