- 100:
- 0.8-6.0公分
drainage boards, geonets, geotextiles, geomembranes, Grass planting grid and other products. The factory operates around the clock, has strong supply capabilities, and has a certain inventory of commonly used models. We have a long-term cooperative logistics company with fast delivery. We have our own cooperative construction party to provide technical
guidance. To choose drainage boards, come to Tai'an Lvtai drainage board manufacturer. "3" "" Manager Song.
Drainage board laying procedures: Foshan garden planting drainage board roll Chaozhou. Centimeter underground garage drainage board direct sales.
. Clean up the garbage on the paving site and level the cement so that there are no obvious concavities and convexities on the site. Outdoor garage roofs and roof gardens need to have -r slopes.
.The basement floor is waterproof, with an elevated floor above the foundation and a round protrusion facing downwards.
3. To prevent water seepage in the inner wall of the basement, drainage boards can be laid on the main wall of the building, with the round protruding platform facing the main wall. Build a single layer of wall outside the drainage board or use steel mesh powder cement to protect the drainage board, so that the space of the seepage board outside the wall flows straight down into the blind ditch and into the sump.
Foshan garden planting drainage board rolling material Chaozhou. Centimeter underground garage drainage board direct sales.
. When laying drainage boards in any area, attention must be paid: Do not let dirt, cement, yellow sand and other garbage enter the front space of the drainage board, and ensure that the space of the drainage board is unobstructed.
. When laying drainage boards, take protective measures as much as possible. When laying drainage boards on the surface or in outdoor garages, backfilling should be done as soon as possible to prevent strong winds from disrupting the drainage boards and affecting the laying quality. The waterproofing of basements and interior walls should be done as soon as possible with a protective layer to prevent the drainage board from being damaged by people or objects. . . 3. . 3. . . . . . .
. The backfill soil is clay soil. It is ideal to spread 3-cm yellow sand on top of the geotextile, which is beneficial to the water filtration of the geotextile.
. When laying the drainage board, the sides should be overlapped with each other at the fulcrum, or the two bottom boards can be brought together, and the geotextile should be used to overlap them. As long as no soil enters the drainage channel of the drainage board, drainage can be maintained. smooth.
Lutai drainage board manufacturer specializes in production and focuses on quality. Strictly control quality and ensure quality and quantity. Since the establishment of the factory, we have always believed that credibility is the foundation of business and quality is the embodiment of credibility. Lutai drainage board manufacturer looks forward to cooperating with you. The manufacturer is at your service 24/7. "
3" "" Manager Song.