- 直径:
- 5米
Before use, please carefully read the switch functions of each button on the electrical console in the manual, and then operate as follows. Turn on the power, the power indicator light will be on, and press the fast button or slow button to prompt the train to start. The stop button works, the speaker emits music, press the stop button (red), and the train stops running.
..< When connecting the line, please refer to the wiring diagram in the manual, and use the < < above < b< copper core wire to connect the red (< +< ) and black (< -< ) on the back wall of the console. The two terminals are connected to the sleeper (< -< ) and the electrode (< +< ) in the middle of the train track respectively. In order to eliminate the unstable vehicle speed caused by poor contact at the track connection, the sliding contact electrode and the sleeper should be connected Extra wiring. The control box should be installed in a dry and ventilated room and well connected.
.3.< Track installation method
.The site where the track is installed should be flat and dry, the track slope should be less than five thousandths, and the track height difference should be controlled within < 3< The sliding contact electrode should be flat, and the bolts connecting it to the bakelite board should be tightened.