- 强度:
- 235
- 售后:
- 现场指导
- 颜色:
- 原色
, .
, . The shear wall formwork support combination device consists of horizontal beams, vertical beams, external corners, internal corners, top tie rods, door cards, Composed of wall screw arch accessories. [Vertical beams] are made of cold-rolled steel plates with a thickness of
, .
, . Vertical beams of composite structures. [Transverse beam] The cross beam is composed of a jacket, a beam core, and a hinge. The jacket and beam core have rectangular holes for adjusting the size of the wall screws. The vertical beams and formwork are fastened with the wall screws to ensure that they do not expand during the concrete pouring. mold. 【Sun Angle】The sun angle is used to connect the turning part of the exterior wall with the beam to ensure the angle of the shear wall during construction. [Inside corner] The inside corner is used at the turning point of the interior wall and is connected with the beam to ensure the angle of the shear wall during construction. [Top tie rod] The top tie rod consists of a ground hook, a shaft adjustment screw, and a buckle. The top buckle of the geograph hook is connected to the geograph prefabricated on the ground and connected to the cross beam. By adjusting the screw rod, the verticality and positioning of the shear wall horizontal plate are ensured. [Opening horizontal bar] The opening horizontal bar requires hook bolts. Connect the horizontal bars and fasten them through threaded rods to ensure that the width of the shear wall horizontal panels at the door meets the size requirements. [Wall-through screws] Wall-through screws are composed of screw washers and nuts and are used to fasten beams and door cards. [Hand-shaped nut] A fastener similar to a fan-shaped bayonet, used to fix wall screws.
, .
. . , 2. Installation process of shear wall support combination device:
Step 1: Assemble the formwork, prepare the formwork according to the wall surface, drill holes, then erect the formwork and assemble it The overall internal and external formwork is carried out simultaneously. Step 2: Install vertical beams and adjust the adjustable vertical beams to the appropriate length. The vertical beams are directly combined with the formwork to bear the pressure generated by the cast-in-place concrete of the wall formwork. Therefore, the butt joints between each formwork and the formwork are It is necessary to fix a vertical beam, fix it with nails, and cover the remaining part. Step 3: Install the cross beam. The cross beam can be connected and locked with gable nuts and wall screws. Step 4: The Yin and Yang corners need to be connected with locks, and the door and window should be locked with hole bars. Step 5: Install the adjustable diagonal support. The upper end is connected to the beam and the lower end is connected to the ground anchor to ensure the verticality of the wall.
. .