- 型号:
- 0.8cm-6.0cm
- 规格:
- 2*15m
- 原料:
- 聚乙烯
Drainage boards are also called filter boards and hydrophobic boards. Our factory uses raw materials and is processed, rolled and shaped by large machines. The drainage board achieves the goal of comprehensively protecting the safety of the system through professional waterproof design, professional water conduction planning and comprehensive protection. This drainage board adopts a special concave and convex hollow vertical rib structure and adopts a relatively simple and reliable connection method to achieve Comprehensive protection, waterproof and water-conducting functions. It is made of durable high-density polyethylene as the main raw material and has a service life of more than 10 years. It is a highly durable waterproof and water-conducting material that is almost unaffected by the outside world. It will not cause pollution to groundwater sources and the ecological environment, and is also harmful to the human body. No harm done. In addition to the basic characteristics of ordinary drainage boards, it also has the properties of resisting plant root thorns and not decomposing. It is a waterproof and water-conducting membrane produced by modern high-tech assembly lines. There are a complete range of garage drainage board models, with roll widths of meters and lengths of meters. The block size is 3*3,*. It has been sold to many urban areas and shipped to all regions across the country! Test reports, certificates, qualifications and other related materials are provided! The manufacturer has professional construction team members to provide welding services!
Construction of garage drainage board: Manager Li
. Floor cleaning
The garage floor should be cleaned before construction. The construction base surface should be flat and solid, without sand, sharp bulges, or holes. Drums, potholes and other phenomena.
. Coiled material auxiliary equipment
. Lay the rolled materials on the structural bottom plate in a certain sequence of front, rear, left and right. Insert the small lap post into the large lap post.
In order to prevent water leakage or roll slipping during construction, glue can be applied to the overlapping edges or cement points can be poured with cement at a certain distance to fix them.
3. Pouring
Pour fine stone concrete on the coiled material, smooth it with a straight rod, and wait until it hardens before proceeding with subsequent construction.
After the concrete is solidified, tie steel bars, pour the concrete surface layer, and set drainage ditches and water collection wells in the bottom plate.
. Precautions
The roll material must be laid with complete overlap and fixed to prevent slurry leakage.
When laying, you should wear soft-soled or spike-free shoes to prevent puncture of the membrane.
When laying, do not drive a heavy vehicle directly on the coiled material to prevent the material from being flattened or broken.
Pay attention to the fire prevention of materials.