- 抗折强度:
- ≥11.5MPa
- 表面强度(压痕直径):
- ≤3.30mm
- 耐磨度比:
- ≥300%
How to grind the floor? Construction quotation phone number
The construction process of stamped flooring is usually divided into steps. Our company's construction includes polishing the surface of the base concrete and evenly sprinkling strengthening powder, smoothing the polished surface and evenly sprinkling release powder, and professional molds to press the pattern. After drying, rinse the surface and apply oily sealant. Taking a square area as an example, it takes about an hour for a mason to press a pattern. The stamped floor construction team is usually staffed by a team of people to cooperate with the construction and improve efficiency. Under normal circumstances, the construction area is about square meters. Qinlu Company has improved its stamped floor construction services. Depending on the specific construction area, the price per square meter ranges from RMB 1 to RMB 3. Interested customers can call for consultation (-Manager Zhao).
* * Principle of cement embossing forming:
* Surface roughening treatment: Add cement slurry to the surface of the concrete that has just been poured but has not been completely agglomerated. Use a manual iron plate to evenly apply water mortar on the surface of the concrete and Ruffled appearance.
* Spread reinforcing material: Spread the specified amount of /3 reinforcing material evenly on the surface of the concrete during the initial setting period. After the reinforced material is completely wet, use a manual iron plate to level and polish to complete the initial work. The reinforced material has initially set to a certain period of time, and then carry out the third material spreading, polishing and leveling work.
* Leveling and polishing strengthening material: According to the hardening condition of the concrete, carry out at least three times of manual iron plate polishing and leveling work, and the polishing operations should be staggered with each other to penetrate the color and durability of the concrete surface. Grinding and strengthening treatment.
* Spread release powder: After the water on the surface of the treated concrete has evaporated and there is no obvious water sheen, then evenly spread a layer of colored release agent matched with the reinforcing material.
* Mold binding pattern: Use special molds with high and low textures to splice and arrange them closely and regularly on the cement embossed surface. Pay attention to keeping the mold fixed and flat before embossing. The binding pattern must be formed at one time and cannot be pressed repeatedly. Make the mold sink into the concrete. The depth of the sinking is related to the strength of the mold and the construction personnel. Skilled workers with rich construction experience can make the embossed textures uniform and consistent in depth, with regular textures on the surface and realistic effects.
* Complete color interaction: After the closed Qinlu cement embossing has completely hardened for one to two days, use washing powder or detergent to wash off the release agent on its surface. The washed-out cement embossing should be retained. There is distributed release powder, which is mostly distributed in the parts where the cement embossing sinks, which can increase the three-dimensionality, layering and color mutation of the cement embossing. After the cement embossed surface is completely dry, use the special protective agent for Qinlu cement embossing to close the cement embossed surface, so that the cement embossing will show the color and texture of natural stone, and at the same time enhance the UV resistance and anti-pollution of Qinlu cement embossing. function.