manufacturers produce and supply all year round: .Fushun high-density polyethylene anti-seepage membrane, .Fushun high-density polyethylene, .Fushun high-density polyethylene anti-seepage membrane manufacturer,. Fushun anti-seepage membrane, Fushun high-density polyethylene anti-seepage membrane, Fushun high-density polyethylene anti-seepage membrane, Fushun high-density polyethylene anti-seepage membrane manufacturer!
Construction method of high-density polyethylene anti-seepage membrane
Do not drag or pull the anti-seepage membrane during transportation to avoid being stabbed by sharp objects.
, should extend from the bottom to the high position, do not pull too tightly, and should leave a margin of . to prepare for local sinking and stretching. Considering the actual situation of this project, the side slopes should be laid in order from top to bottom
. The longitudinal joints of two adjacent sections should not be on a horizontal line, but should be staggered from each other. The feet and bent feet should be placed on a flat surface
, first on the slope and then on the field bottom
. When laying on the slope, the direction of the film expansion should be basically parallel to the maximum slope line.
Laying of anti-seepage membrane:
. Before laying the anti-seepage membrane, the corresponding acceptance certificate of the civil engineering project should be obtained.
. Before cutting the anti-seepage membrane, its relevant dimensions should be accurately measured and then cut according to the actual size. Generally, it is not suitable to cut according to the size shown in the figure. The pieces should be numbered one by one and recorded in detail on a special form.
3. When laying the anti-seepage membrane, the welds should be minimized and raw materials should be saved as much as possible while ensuring quality. It is also easy to ensure quality.
. The overlap width of the joints between the membranes is generally not less than 1, and the welding seam arrangement direction is usually parallel to the maximum slope, that is, arranged along the slope direction.
. Usually in corners and deformed areas, the length of the joints should be shortened as much as possible. Except for special requirements, on slopes with a slope greater than
. When laying the anti-seepage membrane, artificial wrinkles should be avoided. When the temperature is low, it should be tightened and laid as flat as possible.
. After the anti-seepage membrane is laid, walking on the membrane surface, moving tools, etc. should be minimized. Objects that can cause harm to the anti-seepage membrane should not be placed on the anti-seepage membrane or carried on the anti-seepage membrane. Walk on the seepage membrane to avoid accidental damage to the anti-seepage membrane.
Yongli manufacturers have long-term cooperation with environmental protection projects in various regions across the country, such as landfills, sewage tank treatment and other projects. They will choose us, so what are you still hesitating about now? ! The following is the contact information of the manufacturer, you are welcome to call us!
Contact: Manager Xu Tel:
Mobile:
Fax:
Email:@
:
Address: Youth Entrepreneurship Park, Tai'an City, Shandong Province
/>