Main products: high-strength non-shrinkage grouting material series,
3, 3, ring Oxygen grouting material, epoxy repair mortar,
3-bearing grouting material,
High-strength emergency repair material, high-strength polymer mortar, high-performance self-leveling
Mortar (colorful), high-strength wear-resistant material, adhesive Steel glue, reinforcement glue,
Steel-clad pouring glue,
Grouting glue, carbon bonding glue, dry hanging glue interface treatment agent, prestressed
Pipe grouting agent, wear-resistant floor Hardener, etc., and product masterbatch
Professional grouting material manufacturer supplies national high-strength non-shrinkage grouting material, non-shrinkage grouting material, grouting material manufacturer, Zhongshan grouting material manufacturer, direct sales, concrete grouting material, grouting material, secondary grouting material support Seat grouting material Epoxy resin grouting material Shandong grouting material Polyurethane grouting material Grouting material formula High-strength grouting material Qingyuan grouting material manufacturer Epoxy grouting material Grouting material proportioning equipment Grouting material equipment Secondary grouting material Power plant grouting material Shenzhen grouting material High temperature resistance Grouting material Grouting material solution weight grouting material Purpose Grouting material strength standard 3 Non-shrinkage grouting material Concrete grouting material price Guangzhou high-strength non-shrinkage grouting material Foshan epoxy grouting material manufacturer Super strong grouting material Early strength grouting material Anchor bolt anchor grouting material
High-strength non-shrinkage grouting material manufacturer, high-strength non-shrinkage grouting material manufacturer direct selling price
The first step: foundation treatment
The surface of the foundation should be roughened. Clean the foundation surface, and there should be no gravel, floating slurry, floating dust, oil stains, release agents and other debris.
One hour before grouting, the foundation surface should be fully moistened, and one hour before grouting, any accumulated water should be removed.
Step 2: Support and touch
Set up the template according to the grouting construction drawing. The joints between the formwork and the foundation and between the formwork and the formwork should be sealed with cement slurry, tape, etc. to ensure that the entire formwork does not leak.
The horizontal distance between the formwork and the equipment base should be controlled to the left and right to facilitate grouting construction.
The top elevation of the formwork should be higher than the upper surface of the equipment base.
If grouting occurs during grouting, it should be dealt with in time.
Step 3: Preparation of grouting material
Generally speaking, add water and stir according to the standard of 3- for the general reinforced type, and add water and stir according to the standard of - for the pisolite reinforced type.
It is recommended to use mechanical stirring method, and the stirring time is generally - minutes (hand-operated electric drill type stirrers are strictly prohibited). When using manual mixing, you should first add /3 of the water and mix for 1 minute, then add the remaining water and mix until uniform.
The amount of stirring each time should be determined according to the amount of use to ensure that the material is used up within minutes.
When used on site, it is strictly prohibited to mix any additives or external additives into the grouting material.
Step 4: Grouting construction method
For long equipment or track foundation, segmented construction should be used.
Illustration of several commonly used grouting methods
During secondary grouting, the following requirements should be met.