Hello and welcome toTitker Trade Network!
Changli Tianjian standardized steel support system

free member

Steel structure support, butterfly buckle supply, shear wall formwork steel support

价格 2500.00元/吨
total supply
5000 吨
MOQ
1 吨
brand
昌黎天建实业
area
HebeiQinhuangdao City
Delivery period:
Shipped within 15 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

The building formwor

¥4000.00/吨

Time-saving, high-ef

¥2500.00/吨

Tianjian Industrial

¥2500.00/吨

Tianjin building for

¥4000.00/吨

Supply of ground flo

¥2500.00/吨

Henan_New shear wall

¥4000.00/吨

Shop information

area:Hebei Qinhuangdao City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Changli County Tianjian Steel Structure Sales Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
售后:
现场指导
性价比:
价格:
优惠
Changli Tianjian's new formwork support system - the new building formwork support system uses thin-walled steel formwork as the main and secondary back corrugations to replace the steel pipes and square timbers in the traditional formwork process, saving a lot of wood and having the following seven major advantages.
-The wall formwork can adjust the main and secondary backs
-The main backing is welded by two square steel tubes with the same cross-section size, and the secondary backing is made of

-Shaped steel become. The junction of the primary and secondary back flutes has changed from the original

-point

-contact to a

-face

-Contact, large contact area, uniform force. The primary and secondary backings are made of the same material and have the same deformation. Thereby improving the strength and stiffness of the template. The deviation of concrete surface flatness can be controlled within
-.
- Wall formwork opening lock
- Opening locks standardize the formwork for doors, windows and reserved openings in the wall. Using the principle of tightening the outside and the top inside, the main locks are installed on both sides of the wall. After the secondary backing is installed, use a lock to connect the main backing of the formwork on both sides. Adjust the size of the lock according to the thickness of the wall. After the adjustment is completed, tap and lock with a hammer to complete the formwork process. The operation is simple and convenient, which avoids

- running and mold expansion

- phenomena, and improves the appearance quality of concrete.
- Wall formwork male corner lock
- Insert the two main back ribs to be connected into the lock sleeve of the male corner lock, and then use a hammer to hit the lock pin until it is locked. The main back flutes are connected vertically. The process is simple and the connection is reliable and strong.
- Adjustable tie bars for wall formwork
- After the formwork is assembled, you only need to hook one end of the adjustable tie bars for the wall to the pre-embedded anchor point on the ground, adjust the size initially, and connect the other end to the formwork The main backing is locked, and the verticality of the wall can be adjusted by fine-tuning the turnbuckles. The operation process is simple, and the verticality deviation of the wall can be less than
-.
- The wall formwork can follow plastic casing
- When assembling the wall formwork, install a plastic casing with the same length as the wall thickness, which is the casing for the wall bolts and also serves as a control Effect of wall thickness. Since the shape of the casing is designed as

- big and small heads

, it can be easily removed from the wall and reused after the formwork is removed.
-The floor template can adjust the main and auxiliary keels
-According to the size of the room, just adjust the main keel to the appropriate length, and then insert the end insert of the auxiliary keel into the butterfly shape on the main keel Within the lock, the main and auxiliary dragons are connected as a whole to form a horizontal frame of the formwork with greater rigidity,
- thus effectively controlling the flatness of the panel laying.
- Adjustable support ejector rods for floor formwork
- The main keel of the formwork and the support ejector rods are fixed with bracket lock pins, which not only enhances the spatial strength and stability of the formwork support system, but also improves the stability of the formwork. The precision of horizontal elevation adjustment can control the elevation deviation of the template surface within
- ㎜. The formwork system can bear vertical load:
-㎡.
"Steel structure support, butterfly buckle supply, shear wall formwork steel support"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Guangzhou floor decking, 970 floor decki Membrane structure | parking shed membra Membrane structure | Stadium membrane st Square membrane structure | sewage treat Fixed Bearing Guangrun Rubber-Profession Sliding spherical bearings, when buying Steel stirrups Shock-absorbing spherical steel bearing High-quality anti-seismic spherical stee Seismic spherical steel bearings, comple Supply Tianjian manufacturer with strong Steel structure support mobile quick-rel Supply of wall support formwork equipmen Square steel shear wall formwork reinfor High-quality anti-seismic spherical stee
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Steel structure support, butterfly buckle supply, shear wall formwork steel support】are provided by member【Changli County Tianjian Steel Structure Sales Co., Ltd. 】,By Titker Trade Network members 【Changli County Tianjian Steel Structure Sales Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network