Protruding node steel-plastic geogrid steel-plastic geogrid construction method of steel-plastic geogrid
The paving surface of geogrid should be relatively flat to prevent longitudinal skew after the paving layer is accepted. Phenomenon: First draw a white line or a hanging line on the paving layer according to the width to start laying, and then use type nails to fix the ends of the grille (fix with nail roots at an even distance for each meter of width).
After fixing the ends of the grating, use a laying machine or manual method to slowly pull the grating forward and lay it manually for each meter of paving until one roll of grating is finished, and then lay the next roll in the same manner. forward.
. Continuous paving: The unit of roll length is used as the section length for paving. After the section length of the grid is covered, the paving quality is checked as a whole and then the next section is laid.
When laying the next section, the grids and grids should be overlapped by one grid spacing as the overlapping length and fixed with binding wires, and then continue to lay the second section in the forward direction. By analogy, the operation requirements are the same as before.