Hello and welcome toTitker Trade Network!
BJQ gas spacer, detonating tube four-way, detonator, detonating ne

free member

Guizhou Province multifunctional detonator, 500 type rechargeable detonator wholesale

total supply
10000 台
MOQ
1 台
area
FujianLongyan City
Delivery period:
Shipped within 1 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Explosive device pri

¥200.00/台

Mine blasters, deton

¥3.00/台

Shop information

area:Fujian Longyan City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Longyan Kailong Mining Equipment Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Lithium battery rechargeable high energy detonator. A large-scale integrated circuit is used internally to instantly boost the

direct current and then rectify it through a high back-voltage diode to charge a special energy storage capacitor with composite resistance
Network detection type
Series of high-energy pulses The detonator is a multifunctional detonator that can detonate electric detonators and detonators. It has a low current rise time and can provide a strong instantaneous current within the ignition time of the slowest electric detonator.
This product has a high detonation voltage, high capacitance, and is safe and reliable for detonation. It is especially suitable for large and medium-sized blasting and requires high voltage in non-bridged wire anti-miscellaneous electric detonators. The pointer meter is used to display the voltage safely and intuitively. The casing adopts the national unified standard design. The chassis is durable, beautiful and elegant. Both the electrical circuit and the outer casing have passed high-voltage tests and have good insulation. The circuit design is reasonable and easy to use and maintain.
How to use
Open
Open the battery box cover of the detonator base and insert the

high-energy battery
Turn the detonator detonation switch to
br/> Discharge
/
Close
d
gear. Turn on the power switch to
Measuring power
d
At this time, the resistance meter indicates the range
d
. Insert the red
and black plugs into the
network detection
d
jacks and connect the red and black test clips together and the resistance meter will display
d< br/> It means that the blasting network resistance test circuit is working normally.
Detonation
Make sure the detonation button is in the
Discharge
/
Off
d
position. Confirm that the voltage indication of the detonator is zero and connect the blasting bus. Go to the detonator
network detection
d
file. At this time, the resistance meter will automatically display the total resistance value of the blasting network. If the total resistance of the blasting network is greater than
or the blasting network has a break point and the resistance meter indicates a range of
d
, the resistance meter will not change. The power switch is in the
Measuring power supply
d
position for testing the total resistance value of the blasting network detonator resistor
When the switch is in
Charging power supply
d
gear is to turn on the power supply of the detonator and cut off the power supply of the detonator resistor network detection circuit.
When
the resistance value of the blasting network being measured is correct and detonation operation is required, first turn the power switch into the
charging power
d
position and then turn the detonation switch to
br/> Charging
d
Charge in d mode. When the voltage reaches the required detonation voltage or detonator
When the voltage indication on the detonator reaches the red area (
) first turn the power switch to < br/> Measure the power supply
d
Then operate the detonation switch to
Quasi-detonation
d
When detonation is required, press the
detonation button
d
can be detonated
to explode. After the detonation operation is completed, turn the detonation switch to the
discharge
d
position
. If charging to
does not require detonation, please first turn the power switch to< br/> Measuring power supply
d
At this time, the voltage indication on the high-voltage meter head will decrease, which is normal. When you need to detonate again, just turn on the power switch and continue charging. _Copy_Copy_Copy
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Guizhou Province multifunctional detonator, 500 type rechargeable detonator wholesale】are provided by member【Longyan Kailong Mining Equipment Co., Ltd. 】,By Titker Trade Network members 【Longyan Kailong Mining Equipment Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network