- 电机:
- 电压220v/功率1.0kw
- 电动钻孔机整机重量:
- 52kg
- 外型尺寸:
- 700×420×360(mm)
--Jinzhou Shuangxing# Twenty Years of Professional Manufacturing
Contact: Xu Gong
Address: Song, Linghe District, Jinzhou City, Liaoning Province Slope Road
Office-
Fax-
Technical Service
Customer Consultation
--Strive to create a leading brand in the industry# Jinzhou Shuangxing
Electric Rail Drilling Machine Ⅱ_Parameter_Quotation_Picture
The railway equipment produced by Jinzhou Shuangxing is of good quality and low price. It is a very cost-effective product. It has been wholesaled to the outside world for many years. The designated manufacturer for procurement by the mining department strictly controls the quality. The technology and experience are mature and practical for high-speed rail, subway and general public. Iron can be customized and processed according to the styles required by customers. support hotline, , , .
Electric Rail Drilling Machine II_Parameters_Quotation_Pictures
Electric Rail Drilling Machine II is an ideal rail drilling tool for railway engineering, bridge, line overhaul and other departments. It is suitable for railway laying and line maintenance. Maintenance, emergency repair, especially drilling operations in areas and areas with power and electricity. Electric drilling machines can be used for various specifications of rails.
Detailed parameters of electric rail drilling machine II:
. Electric drilling machine drilling range:
. Motor: voltage/power
. Working speed: /
. Installation time: Unloading time:
. Drilling time is less than.
. Stroke is not less than
. Hole deviation:
.Outline dimensions:
.Electric drill Hole machine weight:
. Drill shank taper: Mohs~#
. Suitable for/various types of rails
Electric rail drilling machine Ⅱ_Parameters_Quotation_Pictures
Preparation before rail drilling machine operation:
Installation of drill bit: Install hollow drill bit or twist drill bit according to the needs of on-site work. The specific method is as follows:
This manual takes the installation of a hollow drill bit as an example. Push the feed lever ⑨ toward the gasoline engine to the end.
Then lift the clamp lever ⑥ toward the gasoline engine.
Lift the drilling machine, use a wrench or your fingers to loosen the set screw at the spindle sleeve, install the drill bit core into the drill bit, then align the flat parts of the two belts with the two set screws, insert them into the spline shaft and After being close to the root of the spline shaft, tighten the set screw to complete the installation. This machine tool is shipped with a hollow drill bit from the factory.
Drill bit disassembly: Lift the drilling machine according to the above steps and use a wrench to rotate the bolt counterclockwise to remove the drill bit from the spindle sleeve.
After the operation, you must use the wrench that comes with the machine (if you use other wrenches to cause damage to the machine, you will be responsible for the consequences) to remove the drill bit and apply thin oil or rust inhibitor to the threaded hole.
Installation of positioning blocks:
Choose the positioning block ⑩ that is the same as the rail model given (this positioning block is a combination dual-use positioning block, that is, and and combination are respectively marked with,, and numbers close to the rail side. Indicates which rail type is to be drilled.
.Use of water injection bucket:
Align the handle with the groove at the mouth of the water injection bucket and press down to the root. Rotate the handle counterclockwise until the pressing device is unscrewed and then Fill the water injection bucket with coolant (to prevent the drill bit and the drilled rail hole from rusting). After filling the coolant, tighten it clockwise and then rotate it counterclockwise at a small angle. Take it out from the groove at the mouth of the water injection bucket and press the handle back and forth a few times (towards Pressurize under the water injection bucket) Insert the water pipe into the oil pipe in the fixture of the drilling machine. Hold the water injection bucket with the handle of the water outlet valve, press the water valve with your thumb downward and push it forward to open the state. At this time, press down on the drill bit core to confirm the coolant The next operation can only be carried out after it flows out from the drill bit.
Introduction and installation of the positioning ruler:
This positioning ruler is divided into models such as,,,, etc. The corners of the positioning ruler are marked respectively. Each Each positioning ruler has a positioning groove, which is processed according to the standard hole spacing of the rail.
Pull the ruler locator back and insert the positioning ruler ⑤ into the clamp body and under the first groove.
, add. Fuel and lubricating oil:
Filling the fuel tank: first unscrew the fuel tank cap and add # or more unleaded gasoline or ethanol gasoline, then tighten the fuel tank cap
Filling the lubricating oil: first unscrew the lubrication chamber Fill the fuel tank cap in summer #Gasline oil filling in winter -# When the gasoline oil reaches the mark on the scale, do not add less or more gasoline. Tighten the fuel tank cap. Use your fingers to press the gasoline engine carburetor and soak it for a few times until it is carbureted. The storage bubble of the device is filled with gasoline.
When the temperature is lower than ℃, usually close the damper first (lift it upward), increase the throttle to / position, quickly pull the starting disk, slowly put it back, wait for the gasoline engine to start, and slowly Open the throttle to the maximum (press down) and slowly increase the throttle to idle for a few seconds. Check whether the transmission part is flexible and whether there is any abnormal noise. Whether the screw connection is loose. Press the gasoline engine stop button to prepare for drilling.
Electric Rail Drilling Machine II _Parameters_Quotation_Pictures
Jinzhou Shuangxing Railway Machinery Co., Ltd., in the spirit of seeking development with high quality and excellent service, solemnly promises to you with the concept of high-quality products, reasonable prices, considerate service and the principle of responsibility and openness: < br/> 1. The products are issued with inspection certificates and instructions for use to ensure that users can use our company's products correctly.
2. Jinzhou Shuangxing guarantees that all products shipped from the factory are produced in accordance with relevant national standards and products that fail to pass the inspection are determined. It does not leave the factory. It guarantees that the three guarantees of the product will be strictly fulfilled and fulfilled. The relevant regulations on after-sales service of industrial products of the country will be strictly enforced. If the buyer can confirm that the product will be shipped within one month from the date of shipment or within three months of product installation (whichever comes first) If the product is installed and used correctly in accordance with the methods recommended by the company, it can be proven that the product itself does have design, material or processing defects and a written application is submitted to the company. The company will recall the defective product for free, repair and replace it, or provide a full refund at the order price. .
3. Users raise quality objections to our company's products. The company guarantees to make handling opinions within hours after receiving user objections. If on-site solutions are required, professional and technical service personnel are guaranteed to be dispatched and the service personnel will not evacuate until the quality problem is resolved. Our company will archive every product quality problem and processing result reported by users.
4. Under no circumstances shall our company be responsible for labor, materials, equipment, engineering or other related expenses resulting from the repair and replacement of defective products. Our company's product after-sales service commitment can replace other express or implied forms of product quality guarantees and can be regarded as the buyer's sole compensation and the seller's sole liability.
Jinzhou Shuangxing produces and sells the following products
☆Railway transportation: internal combustion tamping picks, tamping machines, hydraulic rail drilling machines, hydraulic rail drilling machines, manual rail drilling machines, rack type Track starter, hydraulic track starter, rail cutting machine, square sleeper, hydraulic rail straightener, rerailer, universal gauge ruler, rail grinder, square ruler, rail transport car, etc.
☆Track accessories: stoppers Plate, turnout, turnout accessories, turnout tie rod, track gauge ruler, track gauge ruler, track gauge ruler, track gauge ruler, anchor rod, anchor drill rod, pneumatic drill rod, turnout pad, track plywood, road stud, insulating plywood, Crossover switches, pads, composite rubber pads, track fasteners, track clamps, gauge pull rods, rail guard gussets, line gusset bases, insulated gauge rods, gussets, twist drill pipes, coal drill pipes, twist drills Rod, connecting sleeve, chain spreader, wind drill, anchor pallet, pallet, nylon baffle seat, manual switch, manual bender, bender, bending machine, rail pressure plate, fish tail plates, fishtail bolts, etc.
Jinzhou Shuangxing sales network Hebei, Shanxi, Inner Mongolia, Liaoning, Jilin, Heilongjiang, Beijing, Tianjin, Shanghai, Jiangsu, Zhejiang, Anhui, Fujian, Jiangxi, Shandong, Henan, Hubei, Chongqing, Sichuan, Guizhou, Yunnan, Shaanxi, Gansu, Ningxia, Xinjiang and other places.
Remarks: The above content has related product parameters and pictures provided by Jinzhou Shuangxing Railway Machinery Co., Ltd. for reference only. Specific products may have different sources due to different production batches. Please contact the sales staff for specific details.