- 回转角度:
- 180°
- 行走步距mm:
- 1500
- 钻杆钻速r/min:
- 23.5
The pile driver consists of two parts: a hydraulic walking pile frame and a drilling system. The pile frame adopts a hydraulic walking chassis, which has a high degree of automation and can walk and rotate on its own. It is equipped with hydraulic legs to assist walking and rotation and increase the stability of the whole machine during construction. The pile frame is designed with a towing device, which can be transported as a whole.
The column is a foldable box-type column with flange connection, and its lifting and lowering is controlled by a hydraulic cylinder. The drilling system includes a power head and drilling tools. The output shaft of the power head and the auger drilling tools are hollow. The pile driver uses a long spiral to form holes. Concrete (or mud) can be pumped through the center pipe of the drill pipe for concrete pile construction. It can be used for drilling and forming holes in one machine. It can also be used for dry hole forming, grouting replacement and changing of drilling tools. It can also be constructed using various construction methods such as deep stirring.
Maximum drilling depth
Drilling diameter
Maximum lifting force
Allowable tilt angle of columnbr/> Effective length of column
Effective power of power head*
Drilling Rod drilling speed/ .
Maximum output torque of power head
Walking step
Rotation angle
Shoe contact ratio pressure/
Maximum working pressure of hydraulic systembr/> Work Status The maximum slope allowed on the ground
Overall dimensions (length*width*height) Working status**
Overall dimensions (length*width*height) Shipping status**
Pile driver quality
Pile driver quality and transportation conditionbr/> [
Hengwang Heavy Industry
Mechanical Warm Tips]
[After-sales Service]
[Product Transportation]
Our company's products are delivered to a third party for transportation, so there is no guarantee that the product will not be damaged during transportation. If you find that the product is damaged after arrival, please contact the company in time.
Our company's products have passed the inspection by formal inspection agencies. Please do not question the quality of the products.
Please install strictly in accordance with the product instructions, and have professional electricians perform installation and debugging.
Contact person Zhang Zhige
Mobile phone
Telephone
Phone