After the fire is extinguished, the solenoid valve should be closed, the deluge valve should be closed, and the water in the pipe should be removed to keep the system inflation pressure within the >... range and return to quasi-working status.
Installation:
① The main water supply signal butterfly valve, deluge valve, wet alarm valve, etc. of the system should be installed vertically in the control room near the protected area. The temperature of the control room should not be lower than >℃. This prevents the entire system from malfunctioning due to freezing of water in the low-temperature diaphragm cavity.
② During installation, place the diaphragm deluge valve group on the flange of the water source pipe, put a sealing gasket, tighten the flange bolts, and put a sealing gasket on the outlet of the diaphragm deluge valve. The installation specifications are the same > camber. , tighten the bolts. Then connect it to the system pipe network. Open a hole in the straight pipe section at the upper end of the wet alarm valve and connect it to air maintenance equipment such as a low pressure switch, air compressor, and electrical contact pressure gauge.
③ The system drain valve, solenoid valve, manual quick-opening valve, hydraulic alarm bell, water replenishing funnel and other drainage points should be installed, and the floor drain will flow the discharged water into the sewer separately.
④ Install the pressure switch, solenoid valve, signal butterfly valve lead wire and air protection on the deluge valve with a low pressure switch, and connect the lead wires of the electric contact pressure gauge to the fire control center lines respectively.
⑤ The hydraulic alarm bell should be installed near the deluge valve or in a public passage, duty room, with a pipe diameter of >, the length of the alarm pipe should be less than 1 meter, and the height from the alarm valve should not be greater than 1 meter.
⑥ After the installation is completed, turn the anti-reset handwheel of the deluge valve to the anti-reset locking position. The red dot on the handwheel is aligned with the locking position on the sign, so that the system is in a quasi-working state.
Debugging:
① After all the pre-action valve assembly has been installed in accordance with the specifications, debugging can be carried out to supply water to the system so that the deluge valve is in a quasi-working state. Close the lower ball valve and open the upper ball valve. Supply water from the water replenishing funnel to the interface of the wet alarm valve. Turn on the air compressor to supply air to the system. The inflation pressure is generally within the range of >.., and the inflation volume is not less than./.
② Open the solenoid valve or open the manual quick-opening valve, release the pressure in the diaphragm cavity, and open the deluge valve, so that the system side is filled with water and becomes a wet system. At the same time, the hydraulic bell will sound an alarm, and the pressure switch will send out an electrical signal. To test the water flow indicator, you can open the end water testing device. After the water flows, push the paddle to send an action signal to the fire control center. After the test, close the solenoid valve or manual valve, and rotate the anti-reset locking mechanism clockwise to the reset position to allow the deluge valve to automatically reset. Then rotate the handwheel counterclockwise to the locking position to allow the deluge valve to automatically reset. In quasi-working condition. Open the water drain valve on the wet alarm valve to drain the water from the system side. When there is residual water on the alarm valve, immediately close the drain valve to make the system dry. Then turn on the air compressor and inflate the pipeline to ensure that the entire system is in a dry state. Pre-working status.
Maintenance:
>
After the system is put into normal operation, managers must supervise and inspect it on a daily basis. Carry out an alarm test once a month. You can open the test alarm bell ball valve. The hydraulic alarm bell and pressure switch should operate. If any problems are found, you can check the filter and eliminate the fault. A comprehensive functional test is conducted quarterly. Press >.. to perform the test. If it is found that the system air pressure cannot be maintained within the specified range, a fault alarm signal will be sent, the pipeline leakage or damage will be checked, and measures will be taken to eliminate it. The filters installed in the system should be cleaned frequently.
Dimensions:
Rated working pressure (>)
Nominal diameter
Flange outer diameter (>)
Flange Pitch diameter of screw holes (>)
Number of screw holes and hole diameter (>)
< > .
>
>
>