Installation project pricing and measurement, installation constru

free member

Completion Analysis Report Shenzhen Engineering Consulting Shenzhen Municipal Engineering Budget

total supply
0
MOQ
0
brand
深圳诚捷
area
GuangdongShenzhen
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Guangdong Shenzhen

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shenzhen Chengjie Construction Engineering Consulting

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
The completion acceptance report refers to a written report formed after the project is completed and a special acceptance agency established by the relevant department organizes experts to conduct quality assessment and acceptance.
, construction basis
Briefly describe the project feasibility study report approval or plan task statement and approval unit and approval number, approved construction investment and project budget (including revised budget), specified construction scale and production Capacity, the main content of the lump sum agreement for construction projects.
, Project Overview
Preliminary work and implementation of the project
Design, construction, general contracting, construction supervision, equipment suppliers, quality supervision agencies and other units
The start of each individual project and Completion date
The amount of completed work and the resulting production capacity (details of the reasons for advance or delay of the construction period and the reasons for the discrepancy between the production capacity and the original plan, as well as the countermeasures taken during construction to ensure the implementation of the original plan).
, Preliminary inspection and trial operation conditions
Preliminary inspection time, main conclusions of the preliminary inspection, and trial operation conditions (the preliminary inspection report and the main test indicators of the trial operation should be attached, and the trial operation time is generally one month).
, Overview of completed final accounts
Estimates (revised estimates), budget implementation and preliminary final accounts, and conduct investment analysis of communication construction projects.
, Arrangement of engineering technical files
Records of major events during project construction, individual project completion data, concealed project acceptance data, design documents and drawings, supervision documents, major equipment and technical data, and project construction The situation of sorting and archiving the correspondence documents.
, Economic and technical analysis
Test values and conclusions of main technical indicators
Analysis of project quality, description of the situation after handling quality accidents during construction
Construction cost analysis and main economics indicators, as well as the investment benefits obtained by adopting new technologies, new equipment, new materials, and new processes
"Completion Analysis Report Shenzhen Engineering Consulting Shenzhen Municipal Engineering Budget"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Throttle socket type HDPE winding reinfo Hubei Wuhan rigid permeable pipe, plasti Hubei Huangshi curved mesh permeable pip Manufacturer wholesales high-pressure gr Hot dipped plastic steel pipe hot dipped Silicon core tube threading tube hemisph Double wall corrugated pipe pvc double w Optical cable sub-tube communication sub Factory direct sales FRP pipe FRP clamp mpp power pipe mpp power sheathed pipe g Manufacturer specializing in the product Shenzhen Soil and Water Conservation Pla T92 alloy pipe P92 alloy pipe T92 materi Fire protection qualification affiliated Open a branch with first-level fire prot
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Completion Analysis Report Shenzhen Engineering Consulting Shenzhen Municipal Engineering Budget】are provided by member【Shenzhen Chengjie Construction Engineering Consulting 】,By Titker Trade Network members 【Shenzhen Chengjie Construction Engineering Consulting 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network