Hello and welcome toTitker Trade Network!
National power plant water tower, chimney new construction anticor

free member

Heilongjiang Province Cooling Water Tower Leak Stopping Company Cooling Water Tower Demolition Manufacturer Cooling Water Tower Hooping Unit

total supply
0
MOQ
0
brand
锦峰高空工程
area
JiangsuYancheng City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Jiangsu Yancheng City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Jiangsu Jinfeng Aerial Engineering Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Heilongjiang Province Cooling Tower Leak Stopping Company Cooling Water Tower Dismantling Manufacturer Cooling Water Tower Hooping Unit

Hyperbolic Concrete Cooling Tower Repair Leak Stopping and Anti-corrosion Construction Unit Manufacturer and Construction Plan Heilongjiang Province Harbin Thermal Power Plant Natural Ventilation Hyperbolic Suihua Heihe Concrete Cooling tower repair Qiqihar Mudanjiang
Leak plugging and anti-corrosion construction company, Jiamusi
Daqing power plant natural ventilation hyperbolic concrete Yichun Jixi cooling tower repair leak plugging and anti-corrosion construction company, Hegang Shuangyashan
Electricity Natural Ventilation Hyperbolic Reinforced Concrete Qitai River
Songhua River Cooling Tower Repair and Leakage Plugging and Anti-corrosion Construction Manufacturer>Power Plant Natural Ventilation Cooling Tower Repair and Leakage Plugging Construction Unit:
>Jiangsu Jinfeng High Altitude Engineering Co., Ltd.
>Technical consultation:
>Website:
>Email: @
>Natural ventilation cooling tower
> Overview
> Our company’s unit seating spray area is a cooling tower with a height of . The outlet water temperature of the cooling tower under summer frequency % meteorological conditions is. Since the supply water for the circulating water is gray water and the water quality is poor, in order to facilitate cleaning, the cooling tower adopts a trough water distribution system.
> Principle
>High-temperature water passes through the shaft to the main water tank, is distributed to the distribution water tank, and is then sprayed by the nozzle. The high-temperature water sprayed downward comes into contact with the upward flowing low-temperature air, resulting in contact heat transfer. At the same time, evaporation heat transfer occurs due to the evaporation of water. The water molecules on the surface of the hot water are continuously converted into water vapor. In this process, heat is absorbed from the hot water, causing the water to be cooled. The function of the filler is to increase the contact area between water and air and prolong the contact time. Therefore, the filler is required to be highly hydrophilic and have low ventilation resistance. The function of the water eliminator is to separate and discharge water droplets, reduce water loss, and eliminate the impact of floating droplets on the surrounding environment.
>Water Distribution Layout
>The water distribution system consists of a main water tank, a water distribution tank, and a water tank. According to the principle of evenly distributing water throughout the tower to maximize the effective cooling area of the cooling tower, the cooling tower is equipped with a central shaft and a main water tank. One of them distributes water to the inner circumference, and the other main water tank is responsible for water distribution to the periphery of the cooling tower. The main water tank is arranged in a radial pattern. The filler is plastic, the nozzle adopts reflective type III B plastic splashing device, and the water eliminator adopts wave type water eliminator.
>The two pressure water inlet steel pipes of the cooling tower supply water to the inner and outer layers of the composite shaft located in the center of the tower respectively. The cooling tower water distribution system is arranged in inner and outer zones, and the inner and outer areas each account for % of the cooling tower water spray area. , the inner layer
>The shaft supplies water to the inner periphery, and the outer layer shaft supplies water to the periphery. In summer, one tower bears the water volume of each unit. In winter, the inner water distribution system stops operating, and all water flows into the peripheral water distribution system to increase the density of peripheral water spray and prevent the cooling tower from freezing in winter. The water distribution inside and outside the cooling tower is controlled by valves on the circulating water pipe outside the tower. There is a bypass pipe system on the water inlet pipe of the cooling tower. When the heat load of the startup unit is small in winter, the circulating water will be discharged directly into the pool through the bypass pipe to prevent the water spray device from freezing.
> Equipment technical specifications are shown in the table:
Unit natural tower equipment specifications (table)
< > Water tower type

> Natural ventilation counterflow cooling tower


< > Sprinkling area

>


< > Water tower height

>


< > Air inlet height

>


< > Design circulating water volume

> ( Single tower)


< > Catchment tank depth

>


< > Catchment tank water storage capacity

>


< > Evaporation loss (summer heating/winter pure condensation)

> / / (single tower)


< > Wind loss (heating in summer/pure condensation in winter)

> / / (single tower)


< > Sprinkling height

>


< > Number of nozzles

> Each


< > Tower tank diameter

>


< > Throat diameter

>

< br/> < > Tower top diameter

>


< > Shaft height

>


< > Internal and external shaft diameter

> /


< > Main water tank top elevation

>


< > Design inlet and outlet water temperature

> Under summer frequency % meteorological conditions, the water tower outlet water temperature is ℃


< > Water distribution Method

> Trough type


< > Packing type

> Wave


< > Filling material

> Filling


< > Filling layer height

>


< > Drain eliminator type

> B/


< > Drain eliminator material

> Drain eliminator< br/>

< > Number of nozzles

> Each


< > Nozzle type

> Reflection type III


< > Nozzle diameter

>


< > Nozzle material

> B Engineering Plastics


>
>
Quality Standards
> The main distribution tank should be intact without breakage, and the tank should be clean and free of silt and microorganisms. The cover plate on the tank should be complete and without defects.
> The nozzle is firmly installed in the sink, clean and smooth, without aging, breakage or falling off, and the water permeability is %.
> The packing should be placed neatly and intact, and the scale, microorganisms and debris on it should be removed in time.
> The water eliminator should be clean and complete without looseness, breakage or falling. It should be fully covered in the tower and the gaps should not be larger than 1. The drain eliminator hook should be firm and free of corrosion and breakage.
> Steel ladder trails and all railings should be free from rust and breakage.
> The storage tank should be clean and free of sludge and debris.
> Each water supply gate, bypass door, etc. should be opened and closed flexibly, and the openings should be strictly indicated clearly and accurately. After repair, the surface is painted to prevent corrosion. There is no leakage at the packing of each joint surface, and the door pit is clean.
> The bypass pipes of each water supply pipe should be smooth and free of rust and leakage, the brackets should be firm and the needle rollers should be complete, and the welding joints of the expansion joints should be firm and free of cracks.
> The anti-corrosion layer on the inner wall of the tower is intact, and there is no thick accumulation of moss on the surface. The railings on the top of the tower are intact and have no rust or breakage. The lightning protection equipment is well grounded and effective. There are no cracks in each pillar of the tower, and there is no peeling of cement on the surface.
>The grating at the outlet of the water tower has no corrosion, deformation, cracking or other defects. The mesh is smooth and non-clogging. The electric hoist can be lifted and lowered flexibly, and the braking is reliable.
>
Power plant natural ventilation cooling tower maintenance and plugging construction unit:
>Jiangsu Jinfeng High Altitude Engineering Co., Ltd.

>Technical consultation:
< br/>
"Heilongjiang Province Cooling Water Tower Leak Stopping Company Cooling Water Tower Demolition Manufacturer Cooling Water Tower Hooping Unit"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Heilongjiang Province Cooling Water Tower Leak Stopping Company Cooling Water Tower Demolition Manufacturer Cooling Water Tower Hooping Unit】are provided by member【Jiangsu Jinfeng Aerial Engineering Co 】,By Titker Trade Network members 【Jiangsu Jinfeng Aerial Engineering Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network