Product Details
Welcome to consult! Pinghu deep well drilling, Pinghu deep well dewatering, Pinghu road foundation pit light dewatering company, we are a professional drilling company. There are deep water wells drilled mechanically, the depth is generally about meters, and the flow rate can reach tons per hour. The water from deep wells is crystal clear, without silt and turbidity, and has a constant temperature of ℃ all year round. It is mainly used for corporate factories, mechanical cooling and heating air conditioning, bleaching, dyeing, washing, injection molding, chemical greening, breeding bathrooms, construction sites, water plants, villas, units, families, etc. Deep water wells are opened to the groundwater layer, which is warm in winter and cool in summer. It is inexhaustible and cannot be exhausted if it is continuously pumped. The team drills deep wells to ensure flow, ensures the quality of water pumps, pipelines and other materials, is on call, implements three-guarantee tracking services, and strives for survival by reputation and quality. Deep well specifications are generally divided into the following categories. The flow rate is generally required to be within tons per hour, the depth is about meters, the diameter of the drill hole is about centimeters, the diameter of the lowering well wall pipe is, and the pump power is. Submersible deep water pump, well wall pipe Customized high-quality pipes with specifications of "QUALITY", inspection reports, etc. The pipes have strong hardness and can withstand strong lateral pressure. The water intake pipes are equipped with a permeable filter to ensure that the deep water wells are clean and free of sediment, impurities, etc. The pipes It is a nylon pipe with a diameter of .3 inches. The deep water pump is hung in the deep well pipe, about 10 meters away from the wellhead, depending on the rise in underground water level. All areas around the wall pipe should be sealed with coarser yellow sand, and the top of the wellhead can be sealed flat to restore the ground to its original appearance. For deep well drilling of this specification, the construction unit must provide power supply (three-phase), water source, yellow sand (the coarsest specification without mud) and mud drainage channels. The drilling time is generally about a day to be basically completed. The flow rate is about tons, and the depth is generally about meters. The diameter of the pores drilled by the drilling rig is about, the diameter of the lowered well wall pipe is, the power of the water pump is a submersible multi-stage deep well pump, and the well wall pipe specifications are steel-concrete prefabricated high-quality pipes. Take The water pipe is equipped with a permeable filter and an anti-corrosion iron pipe with a diameter of 1.5 inches. The deep well pump is placed approximately 1 meter into the deep well, depending on the degree of underground dynamic water level rise. All the quartz sand of the specification is filled around the water intake pipe. All the quartz sand is filled with mud. The top of the well head can be completely sealed for use. The ground was restored to its original appearance. During the drilling of deep wells with this specification, the construction unit must provide power (three phases can be used continuously), water sources and mud drainage channels. The drilling time is generally about days. The requirements for drilling freshwater wells with guaranteed water quality are generally more stringent. The water composition indicators basically meet the drinking water standards. The flow rate is about tons per hour. The drilling depth in Jiangsu and Zhejiang generally needs to be below meters (in Shanghai, it is required to be below meters). , the specifications of the lower well wall pipe are steel-concrete prefabricated high-quality pipes, and the pipe diameter is anti-corrosion iron pipes. The deep well pump is placed approximately 1 meter in the deep well, depending on the degree of rise in the underground water level. Fill the area around the permeable pipe with quartz sand of the specified specifications. The upper layer of quartz sand must be sealed with yellow mud with strong viscosity and no impurities. The top of the wellhead can be sealed flat to restore the ground to its original appearance. During the drilling of a deep well of this specification, the construction unit must provide power (three phases can be used continuously), water source, and yellow mud (transported to the side of the well). The drilling time is generally about days. Deep wells are drilled underground in rocky areas. The drilling difficulty of the deep wells is relatively high and the construction period is long. Drilling is customized according to different geological rock formation structures. The above information on deep well drilling is for reference only. The details are to be completed through mutual consultation between Party A and Party B. Welcome to consult!
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Pinghu Drilling Drilling Deep Wells and Stone Wells Pinghu Drilling Deep Wells and Drilling Stone Wells Pinghu Drilling Dewatering Wells and Air Conditioning Wells】are provided by member【Hongyun Jingdian Dewatering Engineering Co., Ltd.
】,By Titker Trade Network members 【Hongyun Jingdian Dewatering Engineering Co., Ltd.
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!