Hello and welcome toTitker Trade Network!
Installation project pricing and measurement, installation constru

free member

Social Stability Risk Assessment Report Completion Analysis Report Construction Project Cost Consultation

total supply
0
MOQ
0
brand
深圳诚捷
area
GuangdongShenzhen
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Guangdong Shenzhen

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shenzhen Chengjie Construction Engineering Consulting

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Project completion settlement refers to the project price settlement based on the project progress, construction contract, and construction supervision conditions, as well as adjusting the budget price of the construction drawings and determining the final settlement price of the project based on engineering changes that occur beyond the scope of the construction contract during the implementation of the project. . It is divided into unit project completion settlement, single project completion settlement and construction project completion settlement. The project price settled upon completion is equal to the contract price plus the amount of contract price adjustments during the construction process minus the prepaid and settled project price minus the warranty.
The final account of completion includes all actual expenses in the entire process from fundraising to completion and commissioning, including construction engineering fees, installation engineering fees, equipment and tool purchase fees and reserve fees, investment direction adjustment tax and other expenses. According to the relevant documents stipulated by the Ministry of Finance, the National Development and Reform Commission and the Ministry of Construction, the final accounts for completion are composed of four parts: the final financial accounts for completion, the final financial accounts for completion, the completion drawings of the project and the comparative analysis of the completion cost of the project. The first two parts are also called the final financial accounts upon completion of the construction project and are the core content of the final accounts upon completion.
The preparer and reviewer are different
The unit project completion settlement is prepared by the contractor, and the project developer reviews the general contracting project and is prepared by the specific contractor. On the basis of the review by the general contractor, the developer review. The completion settlement of a single project or the overall settlement of a construction project shall be prepared by the general (contractor), and the contractor may review it directly or entrust a project cost consulting agency with corresponding qualifications to review it.
The documents on the completion of the construction project shall be prepared by the responsible personnel of the construction unit and submitted to the competent department for review, with a copy sent to the relevant design unit at the same time. A copy of the final accounts for completion of large and medium-sized construction projects should also be sent to the Ministry of Finance, the head office of China Construction Bank, the finance bureaus of provinces, municipalities and autonomous regions, and branches of China Construction Bank.
. The goals of the two are different
The settlement is prepared after the construction is completed and reflects the actual cost of the capital construction project.
The final account is an important part of the completion acceptance report. It is the basis for correctly calculating the value of new fixed assets, assessing and analyzing investment effects, establishing and improving economic responsibilities, and is a document that reflects the actual cost and investment effects of the construction project. The final accounts upon completion must correctly determine the value of newly added fixed assets and assess the effectiveness of the investment.
"Social Stability Risk Assessment Report Completion Analysis Report Construction Project Cost Consultation"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
Throttle socket type HDPE winding reinfo Hubei Wuhan rigid permeable pipe, plasti Hubei Huangshi curved mesh permeable pip Manufacturer wholesales high-pressure gr Hot dipped plastic steel pipe hot dipped Silicon core tube threading tube hemisph Double wall corrugated pipe pvc double w Optical cable sub-tube communication sub Factory direct sales FRP pipe FRP clamp mpp power pipe mpp power sheathed pipe g Manufacturer specializing in the product Shenzhen Soil and Water Conservation Pla T92 alloy pipe P92 alloy pipe T92 materi Fire protection qualification affiliated Open a branch with first-level fire prot
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Social Stability Risk Assessment Report Completion Analysis Report Construction Project Cost Consultation】are provided by member【Shenzhen Chengjie Construction Engineering Consulting 】,By Titker Trade Network members 【Shenzhen Chengjie Construction Engineering Consulting 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network