- 型号:
- 履带式柴油打桩机
Installation and operating procedures, crawler diesel pile driver operators must be familiar with the structure, performance, operation essentials and safety precautions of the machine. Only after passing the examination and obtaining the certificate can they operate alone. .
,
The operator must concentrate when operating. Do not talk, laugh, fight or make trouble with unrelated persons. Smoking and eating food are not allowed during operation.
,
Strictly abide by the relevant maintenance regulations of the pile driver and carefully perform maintenance at all levels to ensure that the pile driver is always in good condition. And pay attention to reasonable use and correct operation.
Before working with a crawler diesel pile driver, the following preparations should be made
Learn from the construction personnel about the construction conditions and tasks, as well as the problems found during the construction and matters that the class should pay attention to.
. Adjust the position of the pile driver's transmission gear according to the vibration force required by the construction personnel.
Check whether the insulation of cables and wires is good. Check whether the controller contacts are in good condition and whether the limits are correct.
Check whether the voltage of the power supply meets the requirements.
Lubricate and maintain each part according to daily maintenance items.
Introduction to crawler diesel pile driver
Diameter
Depth
Working mode fully hydraulic
Track length long.meter wide.meter
Scope of application Remote areas Desert areas