- 功率:
- 3-5.5kw
- 转速:
- 1420-2820r/min
- 电压:
- 380/660v
Aluminum Mine Tunnel Drilling Rig
-The tunnel drilling rig is the deepest and most efficient tunnel drilling rig among the series of tunnel drilling rigs for drilling water, exploring water and coring. Because - is the largest specification in the series of tunnel drilling rigs, it can drill holes and core cores of about - meters. It is the one with the largest torque among tunnel drilling rigs, has high power, high efficiency, fast drilling speed, and deep drilling depth.
Tunnel water exploration drilling rigs are divided into two types: spiral differential feed type and power head type (mechanical type and fully hydraulic type)
Features:. The drilling direction is large and the torque can be easily drilled within the range of ~ degrees. Adjustment. .Good disassembly, small size and light weight, suitable for working in coal mines and tunnels with complex operating environments.
Functions: drilling water holes, grouting, coring, prospecting, and mining holes.
-Coring grouting drilling rig parameters
Rated voltage ()
/
Vertical shaft rotation number (r/)
Current()
/.
Weight()
Stroke ()
Power()
Use drill pipe()
&;/
Speed (r/)
Output torque (˙)
Safety warning for use:
) Do not replace electrical explosion-proof components and standard installation kits at will.
b) The hydraulic system must not leak when the drilling rig is working, otherwise it should be stopped immediately and replaced and the leakage should be dealt with in a timely manner. It is strictly prohibited to adjust various pressure regulating valves at will.
) During maintenance, the power must be cut off before the box cover can be opened for maintenance work.
- Maintenance and maintenance of water exploration drilling rig
When the oil temperature in the tank exceeds ℃, it should be stopped for cooling and the oil temperature should drop before continuing to work.
After removing the rotor and oil pipe before each relocation, use a wire plug to block the oil port.
All covers and dust covers must be kept intact and cannot be removed casually.
The clutch must be disconnected when changing gears.
When starting vertical shaft drilling, you must first lift the drilling tool away from the bottom of the hole and wait until the operation is normal before drilling.
Factory address: Liying Industrial Park, Rencheng District, Jining City, Shandong Province
Consultation phone number
: