Hello and welcome toTitker Trade Network!
Rubber bearings Rubber waterstops Bridge expansion joints Prestres

free member

Hebei Kaixiang bridge expansion joint manufacturer explains the construction steps 1

total supply
0
MOQ
0
brand
衡水凯祥
area
HebeiHengshui City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

651 rubber waterstop

Negotiable

Hebei Kaixiang manuf

Negotiable

Kaixiang explains th

Negotiable

Kaixiang introduced

Negotiable

Hengshui Kaixiang ex

Negotiable

Hebei Kaixiang manuf

Negotiable

Shop information

area:Hebei Hengshui City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Hengshui Kaixiang Rubber Products Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
&This process is suitable for on-site pouring and prefabricated concrete structure projects in urban bridge projects, and the construction of arches and brackets in masonry wastewater treatment plants.
Construction preparation
Material requirements
The raw materials required to make the formwork (steel plates, steel sections, steel castings, wood, plywood, plastic boards and other materials) should
comply with current national standards and regulations. Construction organization design requirements.
.The materials, specifications, and
models of steel sections, steel pipes, connectors, welding parts, and embedded parts used in the formwork and arch support systems should comply with the design requirements and relevant standards.
..Construction machinery and equipment
.Formwork, bracket and arch processing and production equipment, and welding equipment.
.Vehicles for transporting formwork, brackets and arches, formwork hoisting machinery (cranes, tower cranes), formwork lifting equipment (hydraulic oil pumps, oil cylinders, jacks, etc.), formwork installation tools (wrenches, crowbars, hand Hammer, etc.).
.Template inspection and testing instruments and tools (total station, theodolite, level, spirit level, line drop, backing ruler, square ruler,
box ruler, etc.)
..
Operating conditions
The roads on site are smooth, the construction site has been cleared and leveled, water and electricity are connected to the site, and night lighting facilities are available.
The required quantities of formwork, brackets and arches have been prepared and ready to go.
Before the support system (racking rack) is installed, the foundation (base, platform) must be solid and reliable, and the surface of the foundation must be cleaned.
Before the formwork is installed (support), the measurement and setting out have been completed.
..
.The investigation of underground structures has been completed and the protection measures for underground structures have been implemented.
Technical preparation
. Design of formwork, brackets and arches
) The design of formwork, brackets and arches should be based on the structural type, design span, load size (including wind load),
The types of foundation soil, construction methods, construction equipment, material supply and related design and construction specifications are carried out.
) The design of formwork, brackets and arches should include the following main contents:
Draw general assembly drawings and detailed construction drawings of formwork, arches and brackets
According to the structural constraints of the formwork, arches and brackets Under the action of construction load, the strength, stiffness and stability of the force system are respectively checked
The installation procedures for formwork, arch and bracket structures are compiled

Hengshui Kaixiang Rubber Products Co., Ltd.
National Service Hotline:
Telephone:
Fax:
Mobile:
Contact: Manager Hou
Email: @
Address: Binhu, Hengshui, Hebei Province Beitian Village, Pengdu Township, New District
<=_
Similar products on the site

Silicone board gray silicone b

¥10.00/

Supply Hengshui plastic waters

¥25.00/

1200 ball mill eight-hole pad,

Negotiable

Heshan basement construction j

¥3.30/

Nylon conveyor belt, heat-resi

Negotiable

ABS 828┪

¥12000.00/

ABS 1152︼

¥12000.00/

ABS P2K】

¥12000.00/

PA66 FNC1'

¥12000.00/

PA66 66∮

¥12000.00/

Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Hebei Kaixiang bridge expansion joint manufacturer explains the construction steps 1】are provided by member【Hengshui Kaixiang Rubber Products Co., Ltd. 】,By Titker Trade Network members 【Hengshui Kaixiang Rubber Products Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network