- 型号:
- ccf-021/ddn
- 规格:
- 100mx1000mmx0.7mm
>Before laying, the ground must be leveled. Avoid direct impact on the use effect due to uneven ground in the future.
>)&The floor heating insulation layer needs to be fully covered, and the auxiliary materials should not be too thick.
>b)&The surrounding floor heating film should be at least c away from the wall.
>c)&When laying floor tiles, it is required to lay a special waterproof protective board on the floor heating film.
>)&When pasting the aluminum film, no bubbles are allowed. The temperature probe must be firmly fixed on the side of the floor heating sheet facing the ground and close to the center.
>)& Each terminal and line should be firmly connected, and the lines should be straight and horizontal. Lines are not allowed to cross in the direction and must be passed through pipes. Necessary sheathing pipes should be installed at corresponding locations. Lines are not allowed to be laid directly on the floor heating tiles, and should be placed in a reserved area centimeters away from the floor heating tiles.
>)&The connecting wires between the floor heating tiles need to be slotted and laid out in the reserved area, and necessary fixings must be made.
>)&When laying floor tiles, the thickness of the cement layer must not exceed c, otherwise it will affect the heating time.
>When possible, the company's thin laying process must be used when laying floor tiles. Specifications of electric heating film:
Electricity consumption
Width
Calories
Specifications
/
c
c
/
c