Special grouting material for large steel structure installation

价格 700.00元/吨
total supply
1111 吨
MOQ
1 吨
brand
华宝远景
area
ShandongJining City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Shop information

area:Shandong Jining City

Member level:corporate memberYear1

identity:   

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Beijing Huabao Vision Construction Technology Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
规格:
50kg/袋
强度:
c60
包装:
防潮牛皮纸袋
Construction and maintenance measures:
⑴ During grouting, the average daily temperature should not be lower than ℃. After grouting, the exposed parts should be sprayed with curing agent or covered with plastic film in time, and covered with wet straw bags to keep them moist. When covered with plastic film, the exposed surface of the cement-based grouting material should be covered tightly to keep condensation water in the plastic film. When watering is inconvenient, curing agent can be sprayed on the surface of the grouting material.
⑵ The grouting material should be kept in a moist state, and the curing time should not be shorter than that.
⑶ When using fast-setting and fast-hardening cement-based grouting materials, maintenance measures should be carried out according to the methods required by the product.
⑷ During winter construction, when the project has no special requirements for strength growth, [] after grouting is completed, the exposed parts should be promptly covered with plastic film and covered with insulation materials. The initial curing temperature should not be higher than ℃. Do not water during maintenance under negative temperature conditions.
⑸When the difference between the surface temperature of the cement-based grouting material and the ambient temperature after the formwork is removed is greater than ℃, it should be covered and cured with
thermal insulation materials.
⑹ If the ambient temperature is lower than the minimum construction temperature required for cement-based grouting materials or the strength needs to increase
, artificial heating maintenance methods can be used. The maintenance measures should comply with the current national standard "Construction Engineering
Cheng Dong Period Construction Regulations". &
"Special grouting material for large steel structure installation"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High-strength non-shrinkage grouting mat DG grouting material manufacturer direct Sikadur 52 Concrete Crack Epoxy Injectio Zhangjiakou high-strength non-shrink gro Shenyang high-strength non-shrinkage gro Hengshui high-strength non-shrink grouti Yanjiao high-strength non-shrink groutin Fangshan high strength grouting material Huairou high strength grouting material Langfang high-strength cement-based grou Beijing high-strength grouting material Heze universal grouting material manufac Zoucheng equipment installation grouting Juye special grouting material manufactu Heze emergency repair grouting material
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Special grouting material for large steel structure installation】are provided by member【Beijing Huabao Vision Construction Technology Co., Ltd. 】,By Titker Trade Network members 【Beijing Huabao Vision Construction Technology Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network