Detailed description of high-strength grouting material
Supply telephone number: or Liu Chunyu (sales manager)
Product features of high-strength grouting material:
. Early strength, high strength: -10-day compressive strength can reach -above.
. High self-flowing property: it can fill all the gaps and meet the requirements of secondary grouting of the equipment.
. Micro expansion: ensure close contact between the equipment and the foundation, and no shrinkage after secondary grouting. The bonding strength is high, and the holding force with steel bars is not less than that.
. Can be constructed in winter: outdoor construction is allowed at -℃ temperature.
. Strong durability: This product is an inorganic cementing material, and its service life is greater than the service life of the base concrete. After millions of fatigue tests, there is no significant change in the strength of the freeze-thaw cycle test. The strength is significantly improved after soaking in engine oil.
.The final strength is high and can reach (above) days later. If there are special requirements, the strength can be adjusted to - or above.
Applications of high-strength grouting materials
. It is suitable for secondary grouting for fixed connections between machine bases, anchor bolts and other equipment, as well as steel structures (rails, steel frames, steel columns, etc.) and foundations.
. Reinforcement, repair and reinforcement of building beams, slabs, columns, foundations, floors and roads.
. Can be used for anchoring anchor bolts and steel bars and structural reinforcement.
. Can be used for base reinforcement and repair of large equipment.
Convenient construction and simple operation
Steps
. Prepare mixing equipment, grouting equipment, formwork and maintenance items, clean the grouting space and wet the concrete surface in advance.
. Set up the formwork and seal the joints of the formwork with cement (sand) slurry and plastic tape to ensure no water or slurry leakage.
. Add -% of the weight of the grouting material and add water and stir (mechanical stirring - minutes, manual stirring for more than 1 minute).
. Pour the evenly stirred grouting material into the grouting part from one direction. If necessary, bamboo strips or steel drills can be used to guide the flow, and the template can be properly vibrated or lightly tapped.
. After the construction is completed, the curing agent should be sprayed immediately or covered with plastic film and covered with straw curtains or quilts for one day of moist curing.
. The operating temperature is -℃ to ℃. It is strictly prohibited to mix any additives or external additives into the grouting material.
Precautions
It is strictly prohibited to use high-speed electric stirring rod to stir the grouting material.
.It is strictly prohibited to use electric vibrators to vibrate grouting materials.
. Mix strictly according to the water-cement ratio, water: ash =:
The following personal suggestions:
. For projects with relatively large operating areas, such as the reinforcement of grout beams and column foundations, etc., you can Use pisolite grouting material.
. For construction with a working area of -cm, general-purpose grouting materials can be used.
. If the grouting project is not smaller than 1cm, super fluid grouting material can be used.
. For construction projects with tight project schedule, early-strength grouting materials can be used.
. For the installation of equipment, our company specially introduces special grouting materials for equipment.
Wanji Jianye’s partial project supply performance
Xishiku Cathedral, CapitaLand International reinforcement, Haidian BMW training base, Juranzhijia Shunyi store reinforcement and decoration project, Anhui Anqing City Songyang Conch building renovation, Xidan Shopping Mall, Tangshan Brewery, Shunyi Longhua Shopping Mall, Beijing People's Hospital, Wangfujing Artillery Battalion No.2 Barracks Renovation, Xihuan Plaza, Shunyi Korean BBQ City, Beijing Yongfeng Base, Tianjin Development Zone Xintiandi Huating, Fujian Nanpu Thermal Power Plant No.2 Phase 1 project, Tianjin Port gate renovation project, Timber Building, Shijingshan Government Audit Bureau, Fujian Nanpu Power Plant, Beijing Sculpture Garden, Fularji Second Power Plant, Tangshan Douhe Power Plant, Yuanbaoshan Power Plant, Yunfeng Power Plant Jilin , Zhangjiakou Shaling Power Plant, Ming Tombs Pumped Storage Power Station, Wangjing Jingkelong Supermarket reinforcement and reconstruction, Henan Jiaozuo Power Plant, Henan First Thermal Power Construction Company, Baotou Second Thermal Power Plant, etc. Customers can visit on site!