Hello and welcome toTitker Trade Network!
Beijing pipeline network construction, Beijing infrastructure cons

free member

Beijing sewage pipeline construction rainwater pipeline construction company infrastructure construction company

total supply
0
MOQ
0
brand
中诚泰
area
Beijing
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Beijing sewage pipel

Negotiable

Beijing road pipe ja

Negotiable

Beijing septic tank

Negotiable

Beijing municipal se

Negotiable

Sewage pipeline cons

Negotiable

Shop information

area:Beijing

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Beijing Zhongchengtai Construction Pipe Network Engineering Co., Ltd.

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Construction of rainwater and sewage pipe networks
1. Measurement and positioning of pipeline lines
Before measuring, check the level points to meet the specification requirements.
During the measurement process, temporary leveling points should be set up along the pipeline route. The distance between the leveling points should not be greater than m and should be closed to the original leveling points. Construction level points should be numbered in sequence and the corresponding elevations should be measured.
If the pipeline route intersects with the original underground structure, the location must be marked with a sign on the ground.
The alignment measurement process should be accurately recorded, and all level points and connecting lines should be marked.
. According to the drawings and the control points disclosed on site, retest the pipeline and well position, do a good job of pile inspection and tie-point work for the center pile, directional pile and fixed well position pile, and measure the elevation closure difference to meet the specification requirements. .
If the piles are found to be misplaced or missing during the construction process, they should be corrected or repaired in time.
"Beijing sewage pipeline construction rainwater pipeline construction company infrastructure construction company"Related Products
Related categories
Building decoration construction wall floor coating Functional coating woodworking paint construction adhesives Coating emulsions and film-forming substances ceramic tile Fine chemicals for construction Coating additives floor Wall stickers/wallpapers wooden material Decorative line board masonry materials Functional Materials Deformation joint device Steel structure/membrane structure Curtain wall and material accessories decorative textiles carpet curtain interior door outdoor door window Door and window hardware ceiling material canopy material cut off Ladders Construction Glass Locks stone stone Insulation Materials Plastic building materials Endurance board Drainage board boeing film Lighting panels and lighting tiles Geomats and blocks Drainage network and three-dimensional network rubber tube Styrofoam Plastic piece Metal building materials Color steel tile steel grating steel fiber closing net Step by step Steel formwork Mesh panels and grating panels rubber Board Special building materials fiberglass Carbon fiber materials for construction Anti-crack additives for construction Covers and trench covers grouting material Wood plastic material sponge Site construction materials asphalt Construction and building materials pipes Pipe fittings water meter Gas Meter Plumbing hardware sanitary ware bathroom furniture Bathroom hardware Shower room/shower kitchen facilities Pipeline system Heating equipment General lighting light source Decorative lighting fixtures outdoor lighting fixtures 室内环保检测仪器 Engineering machinery/construction machinery contractor real estate Mailbox Ceramic production and processing machinery 建材生产加工机械 Work protection craftsman tools Measuring tools Inventory building materials 二手建材加工设备
Related Information
High quality safety mat wholesale safety Miyun Jugezhuang professional equipment Zhuhai real estate construction sand tab Zhongshan real estate construction sand Real estate sand table, construction san A company specializing in mechanical mod A company specializing in villa models, Artificial stone rockery | Cement rocker Which fire protection branch is cheaper? Apply for fire protection engineering in Kaifeng air compressor rental Tongzhou District Yongshun professional It is really a blessing for our owners t Owners of Sun Family commented on Changc Production License
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Beijing sewage pipeline construction rainwater pipeline construction company infrastructure construction company】are provided by member【Beijing Zhongchengtai Construction Pipe Network Engineering Co., Ltd. 】,By Titker Trade Network members 【Beijing Zhongchengtai Construction Pipe Network Engineering Co., Ltd. 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network