- 规格:
- 1200
- 颜色:
- 象牙白
- 金属板厚度:
- 0.6
The construction personnel of Shuangda Company should pay attention to the following relevant requirements during construction preparations. During the installation process of computer room shielding wall panels, special machines and special tools are mainly used. Construction personnel should check whether they are complete before construction. Complete, the specific content that needs to be checked is whether the main materials and accessories are complete and intact and can be used. Special measuring tools should be customized and inspected. If they do not meet the usage requirements, they should be replaced and repaired in time. Before installing special wall panels for metal-faced computer rooms, the clear scope of construction should be clearly defined, and related items such as floor wall foundations should be checked to see if they comply with the relevant conditions in the design and construction drawings, wall installation requirements and fireproof, dustproof, and electrostatic shielding technology. Comply with conditions of use and relevant regulations. And check whether the steel structure or steel frame after acceptance of the concealed project meets the requirements on the construction drawings. These are preparations and favorable guarantees for correct, safe, reliable and efficient construction.
The regulations and requirements for the construction of metal wall panels in the computer room are as follows. When the metal surface computer room wall panels are connected to the foundation or floor, the standards within the benchmark inner line should be popped up first according to the relevant requirements of the engineering design. Then install the connectors on the structural beams of the main foundation of the floor and make them strong and stable so that they cannot fall off at will. The connection between the connectors and the floor of the floor and the main foundation and structural beams should meet the design requirements of fire protection, mildew resistance and dust accumulation, anti-static shielding, not easy to deform, no obvious color difference, not easy to be corroded by acids and alkalis, impact resistance and magnetic interference resistance, etc. for use in computer rooms. The next step of construction work can only be carried out after the request is made. Before installing the steel wall panel of the computer room, Shuangda staff must draw the specific location of the bolt and screw connection dimension lines on the panel. They must not be vague to avoid misplacement when the connection is fixed, thereby avoiding the need to re-connect. The complex process of adjustment provides a strong guarantee for fast and safe construction work. When installing firewall panels, specific operations should be carried out according to the requirements in the construction plan. The splicing of computer room wall panels should be smooth, tight and aligned. It is required that the seams of the anti-static wall panels are even and tight without gaps, and the walls of the computer room should be kept at a vertical angle. For the vertical direction of the wall, the computer room wall panels should be used as high as the wall or as long as possible, and the overlapping gaps of the wall should be minimized so that they are close to the wall. This can provide better conditions for the use of the computer room. The safety and aesthetics play a role that cannot be ignored. When walls need to be overlapped, the overlap length of the fireproof wall panels should not be less than 1 mm, and the outer lap joints should be pressed downwards, but the inner lap joints can be pressed upwards. Special props such as special rivets should be used to connect anti-static wall panels, and the lateral distance between the rivets should not be greater than millimeters. After the erected connection of the shielded wall panels in the computer room is completed, you should immediately check whether the flatness, verticality and aesthetics of the wall are within the corresponding requirements. If the requirements are not met, the construction personnel should immediately make corresponding adjustments to meet the user's requirements. The connections between the machine room wall panels and the steel structure purlins should be fixed using special bolts or self-tapping screws. But it is worth noting that when using bolts, we should use larger gaskets. The tightening force used should be moderate, and the standard should be firm and not loose, and dents should be avoided at the connection fastening points. Phenomenon. The bolts on the computer room wall should be symmetrical and neat, and the spacing between wall panels should be evenly distributed. For machine room steel wall panels used at corners, that is, corner panels should be marked in detail on the design and construction drawings, and they must be installed strictly according to the construction drawings. The inner and outer corners of the corner plates of the machine room metal wall panels should be made of special steel-faced corner plates or angle aluminum. The butt joints should be flat, smooth, dense and even, and should be smooth and vertical with the adjacent machine room wall panels. Adjustment. It is required that the connections at the corners of the corner panels should be neat and consistent and beautiful. Moreover, the horizontal and vertical directions should be straight, and there should be no obvious misalignment, and should meet the requirements of fire protection, mildew prevention and dust accumulation, anti-static shielding, not easy to deform, no obvious color difference, not easy to be corroded by acids and alkalis, impact resistance and magnetic interference, etc. Require conditions. There should be no obvious dents at the joints and no obvious defects such as wavy warping after the inner and outer corners are connected.