- 六盘水注浆管:
- 六盘水注浆管
- 六盘水注浆管:
- 六盘水注浆管
- 六盘水注浆管:
- 六盘水注浆管
According to the ultrasonic transmission method, the overall requirements for Liupanshui grouting pipes are that the joints are firm and do not come apart, the pipe walls are sealed and do not leak, and the pipe wall is smooth and undeformed, and the pipe body is vertical and not skewed inside the pipe. Smooth and free of foreign matter.
Installation of the bottom cage of the Liupan Water Grouting Pipe
Introduction to the benefits of the Ultrasonic Six Pan Water Grouting Pipe
Suitable range does not directly impact the pipe body. When installing, the Liupan Water Grouting Pipe must always be vertical to the first section. Installation of the six-pan water grouting pipe in the steel cage (that is, the cage at the bottom of the pile hole). Pull out the six-pan water grouting pipe with an iron bottom cover at one end, and fix one end of the bottom cover downwards on the main bars of the steel cage. The six-pan water grouting pipe The bottom installation should be connected above the end of the steel bar (shorter than the steel bar). The pipe body must be fixed on the triangular support frame of the steel cage to prevent collision with the concrete pipe when pouring concrete. The first section of the pipe body is fixed with six plates of water on the steel cage. The grouting pipe must be fixed firmly. Two short steel bars are welded to the bottom cover of the pipe to support the pipe body. A steel hoop is used to surround the pipe body above the bottom of the pipe. The bottom steel bar and the hoop steel bar are welded to the main bars of the steel cage. At the same time, fasten with double-stranded iron wires (bundled one at each distance to prevent it from moving up and down and shifting left and right when later hoisting the lower cage or pouring concrete.
Before on-site inspection, measure the sound wave monitor emitted to the bearing The delay time of the system, and the sound time correction value is calculated,
Six-pan water grouting pipe, the weight of the six-pan water grouting pipe is prepared and measured on the top of the pile to reflect the net spacing of the outer wall of the measuring pipe. Cross-hole transmission method in the pile
Equation Multiple six-pan water grouting pipes will be fully assembled with two as one inspection section, and multiple sections will be inspected separately.
Liupan water grouting pipe manufacturer Grouting pile six-pan water grouting pipe