- 阜阳注浆管:
- 阜阳注浆管
- 阜阳注浆管:
- 阜阳注浆管
- 阜阳注浆管:
- 阜阳注浆管
Affected by a series of negative factors that have affected the Fuyang Grouting Pipe Industry and its downstream customers, the Fuyang Grouting Pipe Association has lowered its annual Fuyang Grouting Pipe production, sales and Consumption expectations. The association predicts that the annual output of crude grouting pipes will be 10,000 tons, a year-on-year decrease. It had previously expected the annualized growth rate of crude grouting pipe production to be 10,000 tons. He told reporters that there were only a few times in the past when the Fuyang grouting pipe industry faced such difficulties. This is attributed to increased taxes, increased electricity costs, increased currency appreciation, and a global glut of grouting pipes.
Therefore, it is expected that Fuyang grouting pipe exports will hit a record low this year, imports will increase significantly, and the production capacity utilization rate will be low. In addition, domestic sales of Fuyang grouting pipes were 10,000 tons, a year-on-year decrease. At the same time, the association predicts that Fuyang grouting pipe imports will reach 10,000 tons this year, a year-on-year increase. It is said that as long as the asymmetric competition and the global oversupply of steel pipes are not resolved, our steel pipe manufacturers will still face a very difficult period at home and abroad.
To fix the Fuyang grouting pipe and the steel cage, steel pipe clips are preferred. After the Fuyang grouting pipe is clamped and compressed, the clips are welded to the steel bars. The position and spacing of the fixed points are the same as above. The Fuyang grouting pipe can also be tied with binding wire no smaller than the size. The binding method of the fixed point Fuyang grouting pipe and the steel cage is to first wrap the iron wire around the steel bar twice, and then braid it until it is long. Then spread the iron wire to tie the Fuyang grouting pipe. The positioning ears should be parallel to each other. Straight, and after the upper and lower pipes are pushed in place, use binding wire to tighten the upper and lower positioning ears within the scale line so that the connection area of the sealing ring does not bear tensile force. If a clamp-type hydraulic Fuyang grouting pipe is used, when installing the Fuyang grouting pipe , after the upper and lower pipes are pushed into place, align the annular concave part of the special hydraulic tool die with the annular convex part of the rubber ring inside the socket or the end of the joint within the scale line, and press the pipes at the joint parts to the six sides at the same time First, check the tightness and use a gauge to confirm whether the size is correct. If the gauge can be fully inserted into the hexagonal part, it means the compression is in place.
Fuyang Grouting Pipe Grouting Pipe Manufacturer Price