Product Details
The building formwork support produced by Qinhuangdao Shengchuan Building Materials Co., Ltd. has filled the gap at home and abroad. The building formwork support has currently obtained 2 national patents, including 1 invention patent and 1 utility model patent. What are the advantages of the building formwork support produced by Shengchuan Building Materials? Let us compare it with the traditional support structure
Let’s talk about the traditional support structure first. The traditional support structure has the following three major disadvantages: In the traditional construction technology, the building vertical wall formwork support system adopts the construction method of wooden back corrugation combined with steel pipes. The main back corrugation of the vertical wall is composed of two steel pipes and fasteners. During construction, it is often necessary to use steel pipes one by one. The iron wire can only be locked after it is fixed, which is inconvenient, time-consuming and labor-intensive to construct. Since the length of the steel pipe does not meet the needs, the phenomenon of random cutting and construction is serious, resulting in resource waste management difficulties and construction quality problems. The iron pipe is round, and the stress-bearing area of the connection point with the wood is small. The strength and deformation of the two materials are very different. Therefore, the wood is often compressed and deformed at the contact point, resulting in problems such as poor construction quality. 2. In the traditional construction technology, the secondary corrugation supported by the building formwork is a wooden structure. Since its size is fixed and the building elevations are varied, it needs to be cut off during the construction process. This will inevitably cause waste. If there is a clear space For buildings with large elevations, the only option is to overlap each other or purchase new wooden cubes. This will not only cause greater waste, but also cause problems such as mold expansion and bulging. The combination of wooden squares and steel pipes has different material strengths, resulting in mold running. Since concrete pouring is a wet process, the wood will be affected by moisture and deform. As the number of uses increases, the construction quality will become worse and worse. Extensive use of wood products can cause fire hazards and other hazards. 3. In the traditional construction technology, the locking method at the hole is a combination of steel pipe fasteners. This construction method is very cumbersome. It not only requires a lot of steel pipes and fasteners, but also requires a large number of nails, wires, boards and other more important consumables and tools. Setting up a hole will waste a lot of materials, and it is easy to lose the tools and tools during the construction process. Due to the large number of processes, the error rate increases and construction quality problems also increase. Even when all aspects are guaranteed to be foolproof, due to the mixing of steel and wood, the material hardness and deformation are greatly different, and mold expansion often occurs at the joint. Phenomenon.
Regarding the above disadvantages of the support system in the traditional technology, the rationalization and scientific design of the building formwork support
have solved the above problems very well.
Building formwork support
The main backing is welded by two square tubes with the same cross-sectional size. After the wall bolts are installed during construction, only one person only needs to pick up the main backing horizontally and place it on the Just lock the bolts, which saves time and effort. Moreover, because the secondary backing used in conjunction with it is a square steel structure, the force is evenly distributed and the construction effect is good. The main backing of the wall formwork can meet various construction requirements. , shear walls and concealed columns of any size can provide stable and beautiful support, achieving firm support and first-class quality after formwork removal, improving project quality, and building formwork support
Adjustable secondary back corrugation for Steel products are made of thin-walled steel structures with high strength and light weight. Direct contact formwork is used as the vertical frames of the formwork. After the vertical wall formwork layout is installed, it is stretched to the required size, directly vertical, and pressed to a certain The spacing can be arranged in parallel, which plays the role of supporting the skeleton of the formwork. Building formwork support
The opening lock uses the principle of tightening the outside and the roof inside. Only one lock can achieve the function of locking the opening. You only need to assemble the formwork at each opening, install the primary and secondary backings, and adjust the opening. Depending on the size of the lock, just hit and lock it with a hammer to complete the mold setting process. During the vibration process, you don’t have to worry about the mold opening opening, eliminating the need for plastering the opening, which not only saves the construction period but also saves a lot of raw materials. In addition, We have professional technical personnel who can calculate the quantity of products required for the project, provide construction plans, and provide on-site guidance and installation services free of charge!
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Building formwork support】are provided by member【Qinhuangdao Shengchuan Building Materials Co
】,By Titker Trade Network members 【Qinhuangdao Shengchuan Building Materials Co
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!