- 规格:
- 可定制
- 型号:
- 各种
The automatic elevator and computer automatic batching system realize automatic batching of water and admixtures, fully automatic mixing with sand and cement, and automatic spiral material distribution and blanking. The slurry can be automatically stirred every hour. Installed power.
Fully automatic cutting saw
It consists of a longitudinal cutting saw, a cross cutting saw and a plate carrier trolley. This cutting saw can cut at will, cutting size,, product specifications can be cut at will according to needs, installed power.
Group drill
Composed of a motor and a drilling and milling head, it can drill and mill countersunk holes on the insulation board at one time. The drill holes are evenly distributed, which facilitates the fixing and installation of anchor nails during construction. During the construction process, the construction process is simplified and engineering efficiency is improved. >Product features of permanent disassembly-free integrated thermal insulation formwork equipment, automatic plate making machine
This machine adopts automated multi-pass rolling, netting, and non-woven fabric plate making. It can be formed in one go. The plate making speed is fast and the plate material is Smooth and flat, the specifications can be adjusted arbitrarily, and the thickness is even. In the mortar state, this machine distributes the mesh up and down in order. The same machine can realize composite production and one-time composite molding of polystyrene board or extruded board, and form a mortar net inside the composite board. three-dimensional connection structure. Due to the advanced technology and unique process used, not only the production efficiency is doubled, the board manufacturing cost is greatly reduced, but also the overall quality, mechanical strength and surface bonding fastness of the insulation board are greatly improved, fundamentally overcoming the It overcomes the shortcomings of traditional polystyrene boards and extruded boards caused by on-site construction of repetitive labor and complex processes, weak bonding, and high construction costs. The machine's unique process is the first of its kind in China, and its advanced technology ranks it in the leading position in the country. It is the best choice to achieve mechanization, standardization and large-scale production of composite polystyrene, insulation boards or composite extruded insulation boards
>Basic description of the disassembly-free integrated thermal insulation formwork equipment. The permanent composite external formwork cast-in-place concrete insulation structural system uses a cement-based double-sided composite insulation board as the permanent external formwork. Concrete is poured on the inside and anti-crack mortar is applied on the outside. The protective layer is an insulation structural system formed by firmly connecting the double-sided composite insulation formwork and concrete through connectors. This system is a cast-in-place reinforced concrete composite insulation structure system and is suitable for cast-in-place concrete structural projects such as exterior walls, columns, and beams of industrial and civil building frame structures and shear wall structures.
The permanent composite external formwork is composed of insulation boards, insulation transition layers, bonding reinforcement layers and reinforcements on both inner and outer sides. The product has the characteristics of light weight, good thermal insulation effect, convenient construction, good fire protection performance, and no safety hazards. , has the same lifespan as the building and other excellent features.
During the construction of the composite external formwork insulation system, the composite insulation board is used as the permanent external formwork on the outside. The cast-in-place concrete wall and the permanent external formwork are poured into one body and connected through anchor bolts to make it safer and more reliable. After completion, a protective layer of mortar will be applied on the outside to meet the requirements of building energy saving
> Working principle of permanent non-disassembly integrated thermal insulation formwork equipment. The permanent composite external formwork cast-in-place concrete insulation structural system is based on cement-based double-sided composite insulation panels. It is a permanent external formwork. Concrete is poured on the inside, and a protective layer of anti-crack mortar is applied on the outside. The double-sided composite insulation formwork is firmly connected to the concrete through connectors to form an insulation structural system. This system is a cast-in-place reinforced concrete composite insulation structure system and is suitable for cast-in-place concrete structural projects such as exterior walls, columns, and beams of industrial and civil building frame structures and shear wall structures.
Disassembly-free integrated composite formwork insulation board equipment
>Permanent disassembly-free integrated insulation formwork equipment parameters specifications and technical parameters
Overall dimensions length and width
Installed power
Plate making Long specification
Work efficiency class production