- 规格:
- 75-160
Features of drainage pipes
The pipe has excellent surface hardness and tensile strength, and the pipe safety factor is high.
It has good aging resistance and its normal service life can reach more than 10 years.
The pipeline has excellent corrosion resistance to inorganic acids, alkalis, and salts, and is suitable for industrial sewage discharge and transportation.
The friction coefficient of the pipeline is small, the water flow is smooth, it is not easy to block, and the maintenance workload is small.
The material has a high oxygen index and is self-extinguishing.
The linear expansion coefficient of the pipeline is small, and the amount of deformation affected by temperature is small. The thermal conductivity and elastic modulus are small, and compared with cast iron drainage pipes, they have excellent freezing resistance.
Pipes and pipe fittings can be connected by bonding. The construction method is simple, the operation is convenient, and the installation efficiency is high.
In the indoor and outdoor drainage pipeline projects of industrial and civil buildings, any industrial wastewater with a temperature no higher than that of continuously discharged domestic sewage, a temperature of no higher than that of instantaneously discharged sewage, and no corrosive effect on pipes can be used.
Spiral silencer pipe_Copy of Liansu
Drainage pipe connection
Pipe socket connection should strictly follow the following procedures
① Wipe the pipe socket and pipe fitting socket before bonding the connection clean.
② Measure the depth of the socket and mark the end of the pipe.
③ Apply adhesive, first to the socket and then to the socket. The coating should be even and appropriate.
④ Align the direction, insert it into the marked area at one time, and rotate/circle.
⑤ Wipe off the remaining adhesive on the socket.
⑥ Let the bonded pipe stand until the joint solidifies.
The following regulations should be followed for the safe use of adhesives
① Adhesives and detergents should be used as soon as they are opened, and non-operators are not allowed to use them.
② There should be no open flames at the bonding points and good ventilation.
③ It is not suitable for construction below ℃, and the bonding points must not be baked with fire.
④ Construction workers should wear gloves. If the adhesive accidentally gets into your eyes, rinse immediately with plenty of water and send to hospital for treatment.
Liansu
Drainage pipe installation instructions, sawing pipe and beveling
The length of the saw pipe is determined layer by layer based on actual measurements and combined with the size of each connecting pipe fitting. Pipe sawing tools should use fine-tooth saws, cutters, pipe cutters and other tools. The fracture should be flat and there should be no deformation at the cross section. The socket part to be bonded can be filed into a bevel with a medium-sized board file. The groove length is generally no less than 1/2 of the pipe wall thickness. After the bevel is completed, the debris should be removed.
Protection of the socket interface
After the socket interface is connected, the extruded adhesive should be wiped clean with cotton gauze and other detergents. Wait until the joint is cured according to the properties of the adhesive and the climatic conditions.
The curing time should be appropriately extended during winter construction.