Hello and welcome toTitker Trade Network!
Repair all kinds of inverter, repair all kinds of servo, repair al

free member

Liyang Japan TOYO inverter Toshiba toshiba inverter repair

价格 500.00元/台
total supply
10 台
MOQ
1 台
brand
日本东洋TOYO|东芝toshia
area
JiangsuChangzhou City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

Jintan ABB inverter

¥400.00/台

Zhenjiang German NOR

¥900.00/台

Kunshan German SEW d

¥400.00/台

Yixing Hitachi inver

¥1000.00/台

Changshu British CT

¥300.00/台

Jurong Germany Kobe

¥500.00/台

Shop information

area:Jiangsu Changzhou City

Member level:corporate memberYear1

identity:  

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Changzhou Lima Automation Co

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Model Reference
Troubleshooting DC reactor, also known as smoothing reactor, is mainly used on the DC side of the converter and has many applications in general frequency converters. A DC current with an AC component flows through the reactor. The main purpose is to limit the AC component superimposed on the DC current to a certain specified value, maintain the continuity of the rectified current, reduce the current ripple value, improve the input power factor, and suppress the harmonics generated by the converter device.
Overcurrent acceleration time during acceleration is too short
Improper ratio
During a momentary power outage, a restart occurs relative to the rotating motor
Special motor (impedance? /? Extended acceleration time
Check and change the setting of the ratio
Use instantaneous stop restart ( ) or instantaneous stop non-stop control ( )
Increase carrier frequency ( )
Overcurrent deceleration during deceleration Time extension
Rapid changes in overcurrent load during constant speed operation
Load abnormality
Reduce load changes
Check the load device
Load side overcurrent output side main circuit during starting Poor wiring or motor insulation
Motor impedance is too small
Check the wiring and motor insulation conditions
Set output short circuit detection selection
Phase branch line short circuit main circuit component (phase) abnormality Request maintenance service
Phase branch line short circuit main circuit component (phase) is abnormal. Request maintenance service
Phase branch line short circuit main circuit component (phase) is abnormal. Request maintenance service
Input phase loss main circuit input phase loss inspection Check whether the main circuit wiring on the input side is missing a phase
Output phase is missing Main circuit output phase is missing Check whether the main circuit wiring on the output side is missing a phase
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Liyang Japan TOYO inverter Toshiba toshiba inverter repair】are provided by member【Changzhou Lima Automation Co 】,By Titker Trade Network members 【Changzhou Lima Automation Co 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network