Product Details
Organize all construction personnel to carefully familiarize themselves with the drawings and understand the design intentions, especially the laying process of thickened areas such as pole vault, long jump and high jump.
Designate a dedicated person to collect weather forecast data and get in touch with the local meteorological station to master the local short- and medium-term meteorological information during the entire construction period, and promptly adjust the construction arrangements of the
plastic track
project to ensure the installation work is on schedule. The quality and progress are not affected by climate temperature and air humidity
In order to reduce construction joints to ensure
Plastic track
The surface is smooth and beautiful and staffed, the main road is divided into two working sections, each semicircle is One working section, the auxiliary area is divided into working sections, and we strive to have construction joints in the entire track and field, except for the red and green junctions, only the first and third straight and curved junctions have construction joints
As a guarantee
Plastic Track
paving quality and workmanship, each process is equipped with a quality inspector and re-inspector in addition to the normal equipment
dust removal and cleaning to clean the surface of the
plastic track
, especially carefully check whether there is cement mortar dripping from civil engineering works and oil stains caused by oil leakage from paver rollers
Smoothness inspection and leveling In order to ensure that the entire site is paved flat and with uniform thickness, use tap water to check the pavement before construction. The entire site should be watered. Watering should be thorough and slow, and forced flushing should be strictly prohibited. After the water has dried up, mark the depressions with a pen and fill them up with mixed base material until the entire site is completely covered with water. Fill up the depressions on the site until there is no accumulation of water
The purpose of the trial paving is first to master the performance of
plastic track
materials, and secondly, according to the specific conditions of the construction site such as temperature, air humidity and ground The moisture content determines the best mix ratio of paving materials and masters the curing time
After checking and confirming that the foundation and small tests meet the requirements, start
plastic track
base glue construction, the thickness is
Calculate the required semi-finished products based on the paving area of the day, and place all the materials and machines required for the
plastic track
construction at the construction site
Check the mixing machinery circuits of the machines, especially the weights and measures tools accuracy.
Guanaotong has been in the sports ground construction industry for seventeen years and has taken over more than 100 sports ground construction projects nationwide. Guanaotong’s professional sports ground construction team and excellent construction technology can provide your sports ground
Plastic track construction provides one-stop construction solutions.
Guanaotong is the first brand of sports venue construction in China. Free consultation nationwide or contact Ms. Wang. Welcome to consult and negotiate business.
Address Floor, Jialin Haoting, No. Shennan Avenue, Futian District, Shenzhen
Disclaimer
The information/pictures/parameters, etc. displayed on this webpage about【Preparation work before paving the plastic track surface】are provided by member【Shenzhen Guanaotong Health Industry Co., Ltd.
】,By Titker Trade Network members 【Shenzhen Guanaotong Health Industry Co., Ltd.
】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.
If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!