Hello and welcome toTitker Trade Network!
Production and sales of logistics machinery and equipment, cargo t

free member

Sleeper plate guide, sleeper plate guide manufacturer, sleeper plate guide price

total supply
5000 件
MOQ
1 件
brand
中运
area
ShandongJining City
Delivery period:
Shipped within 3 days from the date of payment by the buyer
Buyers are still looking
  • 1
  • 2
  • 3
Products Recommended

DMG-2.2 electric pro

¥1.00/件

Fence type cars, Fen

¥1.00/件

Fence car sales

¥1.00/件

Packaging machine, p

¥1.00/件

Trucks Trucks used c

¥1.00/件

Used trucks for sale

¥1.00/件

Shop information

area:Shandong Jining City

Member level:corporate memberYear1

identity:   

Already paid:0.00 yuan deposit

my badge: [Integrity File]

online service:

Business card

Shandong Zhongyun Logistics Co., Ltd., Jining Branch

Applets
【Kind tips】When you call, please mention that you saw us on Titker Trade Network, thank you.
Product Details
Sleeper plate guide, sleeper plate guide, sleeper plate guide manufacturer, sleeper plate guide price
Scope of application of sleeper plate guide
Type sleeper plate guide, which has a simple structure , small in size, light in weight, simple to operate, easy to carry, and reliable in operation, it is an ideal special tool for railway laying and maintenance of light rails.
Main technical parameters of sleeper plate lifter
Maximum lift force
Maximum lift capacity
Hydraulic system pressure
Maximum operating force of hand handle
Outer Dimensions
Basic structure and working principle of the sleeper plate guide
The reciprocating swing control handle makes the plunger pump work through the fixed block mechanism to suck oil and press the high-pressure oil into the working cylinder to extend the piston rod. A thrust is generated to raise the lifting hook and hold up the rail, thereby achieving the purpose of lifting the rail.
How to use the sleeper plate lifter and precautions
Insert the lift hook into the bottom of the rail and close and tighten the unloading valve.
Insert the operating handle into the handle seat, swing the handle rod back and forth, the oil pump works, press high-pressure oil into the oil cylinder, the piston rod extends, the track hook rises and lifts the rail to the required height.
After starting the road, loosen the unloading valve and return the road hook to its original position.
To ensure safety, if you encounter a moving locomotive during starting, you should immediately loosen the unloading valve and lift the machine away.
The oil in the fuel tank should be cleaned and replaced regularly. To maintain the service life of the machine.
Pay attention to the maintenance of the machine and do not drop it or touch it randomly.
As the specific models of product production batches are different, the above pictures are for reference only. For details, please contact our sales staff for specific verification.
Toll Free Sales Telephone
Disclaimer

The information/pictures/parameters, etc. displayed on this webpage about【Sleeper plate guide, sleeper plate guide manufacturer, sleeper plate guide price】are provided by member【Shandong Zhongyun Logistics Co., Ltd., Jining Branch 】,By Titker Trade Network members 【Shandong Zhongyun Logistics Co., Ltd., Jining Branch 】is solely responsible for the authenticity, accuracy and legality of the information/pictures/parameters, etc.,Titker Trade Network only provides display services. For your safety, please choose Titker Trade Network for online trading, otherwise Titker Trade Network will not bear any responsibility for this.

If your legitimate rights and interests have been infringed, please contact Titker Trade Network customer service as soon as possible. We will serve you wholeheartedly. Thank you for your attention and support to Titker Trade Network!

Titker Trade Network